Concrete Pouring Weather in Colorado Springs, CO: 10-Day Windows & Best Months
The concrete pouring season in Colorado Springs runs May through September — 5 months averaging at least 8 workable days by NOAA 1991–2020 normals. The single best month is September, averaging 23 days that clear every check — highs of 77°F, lows near 49°F, and a 23% daily rain chance. Below: today through day 10 against the label rules, then the year at a glance.
GOOD — every label check passes MARGINAL — one soft fail NO — hard fail or several soft
The rules this check uses
The Colorado Springs strip runs on these rows — bagged-mix consensus for DIY-scale work, ruled by the 48-hour freeze check. Structural pours answer to an engineer and ACI, not to this page.
| Check | Threshold | Why it matters |
|---|---|---|
| Air temperature | 40–90°F — ideal 50–85°F | The film (or mix) chemistry runs on temperature — both while you work and for the first hours after. |
| Overnight low | ≥40°F during the first 48 h | Curing continues after dark; the first night can undo a perfect afternoon. |
| Dry before | no soaking (≥1.0") in the prior 24 h | Checked backward from your start hour using the two look-back days in the forecast data. |
| Dry after | <0.1" rain for 6 h after (12 h light rain after finishing still risks surface marks) | The engine sums forecast rain hour by hour through the cure window for Colorado Springs. |
| Wind | ≤20 mph (rapid surface drying up to 28 mph) | Hot wind pulls bleed water out faster than the slab can handle. |
Always follow your product label — formulas vary. The table above is the typical range across major manufacturers, not a promise about your can.
Best months for concrete pouring in Colorado Springs
| Month | Avg high | Avg low | Rain odds/day | Workable days | |
|---|---|---|---|---|---|
| January | 45°F | 18°F | 12% | 0 | |
| February | 47°F | 20°F | 16% | 0 | |
| March | 55°F | 27°F | 21% | 0 | |
| April | 61°F | 34°F | 27% | 0 | |
| May | 71°F | 44°F | 33% | 17 | |
| June | 82°F | 53°F | 34% | 20 | |
| July | 86°F | 58°F | 39% | 19 | |
| August | 84°F | 57°F | 38% | 19 | |
| September | 77°F | 49°F | 23% | 23 | |
| October | 65°F | 37°F | 16% | 6 | |
| November | 53°F | 26°F | 15% | 0 | |
| December | 45°F | 19°F | 12% | 0 |
Figure 104 workable days a year in Colorado Springs, spread across May through September. Shoulder months turn on the overnight rule: an afternoon at 71°F passes, but the 40°F night floor is what actually opens the season in May. The Colorado table ranks every listed city by the same math.
The rain odds swing hard across the year — 12% of days in January up to 39% in July. Season the plan accordingly: prep in the wet months, apply in the dry ones.
Sealing the same driveway later? Sealcoating in Colorado Springs wants warmer nights (50°F+) than the pour did.
Source honesty: every monthly figure on this page is the 1991–2020 normal at Colorado Springs Muni Ap, Co Us, 9.0 km from Colorado Springs's center — your block's shade lines and wind exposure sit on top of that baseline. Scoring details are on the methodology page.
Colorado Springs by the numbers
- Hottest month: July — 86°F average high, 0 days topping 90°F.
- The cold floor is December at 45°F afternoons and 19°F overnight.
- Measurable rain: July leads at 39% of days; January is the quiet end at 12%.
- The 40°F-night season spans May–September here.
- Bottom line for Colorado Springs: roughly 104 workable concrete pouring days a year.
Prep checklist
- Clear the 48-hour rule first: two nights over 40°F. May opens that door in Colorado Springs; December (19°F average lows) slams it.
- Nothing gets mixed until the site is staged — braced forms, compacted damp base, rinsed tools, a second pair of hands.
- Cut plastic sheeting and weight it at the pour's edge — Colorado Springs sees rain on 23% of September days, and the 6-hour rule doesn't negotiate.
- Mix to a low slump — thick oatmeal, not soup; extra water now is a weak surface forever.
- Timing beats muscle — screed wet, float at the dull stage, and never chase bleed water with a trowel.
- Edge and joint with an edger + float set — control joints every 2–3 slab-thicknesses in feet.
- Hold the moisture in (sheeting or misting); when September nights dip toward 49°F, a curing blanket is the difference.
- Keep feet off 24–48 hours and cars off a week; structural pours follow the engineer and ACI, full stop.
Gear that saves a window
Transparency note: gear links here become affiliate links only when the program is enabled — today they are plain references. See the affiliate disclosure.
-
Edger + float set
Rounded edges and a flat surface before it sets.
-
Curing blanket
Holds heat through cold nights in the critical 48 hours.
-
IR surface thermometer
Track slab temperature, not just the forecast.
-
Plastic sheeting
Emergency rain cover and moisture-holding cure layer.
FAQ
What temperature is too cold to pour concrete?
The line is a 40°F low inside the first 48 hours; an actual freeze (32°F) physically damages young concrete. Colorado Springs's December nights average 19°F — firmly out — while September nights hold near 49°F. Small pours only; structural work follows engineer/ACI specs.
Can you pour concrete before rain?
The engine wants 6 protected hours; light rain later actually feeds the cure. With 39% rain-day odds in July versus 12% in January, Colorado Springs's dry-season pours barely think about this rule and wet-season pours live by the radar. For small DIY pours; structural schedules follow ACI.
How long does concrete need to be protected from freezing?
Keep it above freezing for at least the first 48 hours (the engine calls any sub-40°F low in that window a NO). In Colorado Springs that rules out roughly December-adjacent months entirely and makes shoulder-season pours a two-night forecast decision. DIY scope; anything structural follows engineer/ACI cold-weather practice.
Is it OK to pour concrete in hot weather?
To a 90°F high, yes — with shade, cool mix water, a damp subgrade, and a dawn start. Above 90°F the surface sets while the core is plastic and shrinkage cracks map the slab. Colorado Springs averages 0 such days in July — rarely the binding constraint here.
How long before you can drive on new concrete?
A week before tires, 24–48 hours before feet — at September-typical Colorado Springs temperatures (77°F highs). When nights slide toward 19°F, add days: cure speed is temperature. Early loads print permanent marks; the bag's cure table wins every argument.
Best season for concrete work in Colorado Springs?
May through september — the months with 40°F+ nights, sub-90°F days, and manageable rain. September leads at 23 workable days; December bottoms out near 0.
Related
Other projects in Colorado Springs
- Deck Staining in Colorado Springs
- Exterior Painting in Colorado Springs
- Driveway Sealing in Colorado Springs
- Roof Coating in Colorado Springs
- Lawn Seeding in Colorado Springs
- All outdoor project weather in Colorado Springs
Concrete Pouring nearby
- Castle Rock, CO
- Pueblo, CO
- Highlands Ranch, CO
- Centennial, CO
- Aurora, CO
- Lakewood, CO
- Denver, CO
- Arvada, CO
Guides
Climatology: NOAA 1991–2020 normals via COLORADO SPRINGS MUNI AP, CO US (9.0 km from Colorado Springs center, elevation 6181 ft); live outlook by Open-Meteo.