Concrete Pouring Weather in Greeley, CO: 10-Day Windows & Best Months

In Greeley, the label math works from May through June: that's the stretch with 8+ workable days a month against typical concrete pouring rules. The single best month is September, averaging 24 days that clear every check — highs of 82°F, lows near 49°F, and a 20% daily rain chance. The strip above runs Greeley's live forecast; the table below ranks all 12 months.

Best month: May · 19 workable days

The next 10 days in Greeley

GOOD — clears every rule MARGINAL — exactly one soft miss NO — a hard fail, or two soft

The rules this check uses

Every verdict above applies this table to Greeley's hours. DIY scope only: the freeze row outranks everything, and structural work belongs to engineer/ACI specifications.

Typical label thresholds for concrete pouring — the ruleset behind every Greeley verdict above.
CheckThresholdWhy it matters
Air temperature 40–90°F — ideal 50–85°F Checked across the working day, 8 a.m.–6 p.m., against Greeley's hourly forecast — not just the daily high.
Overnight low ≥40°F during the first 48 h The engine reads every overnight hour in the cure window, not just Greeley's forecast low.
Dry before no soaking (≥1.0") in the prior 24 h Rain before the pour only matters if the ground is soaked or standing in water.
Dry after <0.1" rain for 6 h after (12 h light rain after finishing still risks surface marks) A downpour in the first 6 hours can wash the surface; after final set, rain actually helps curing.
Wind ≤20 mph (rapid surface drying up to 28 mph) Wind wrecks application first (drift, lap marks) and carries debris into wet work second.

Always follow your product label — formulas vary. These rows are the industry-typical range; the can in your Greeley garage is the contract.

Best months for concrete pouring in Greeley

January: 0 workable days · high 44°F / low 18°F · rain 12% of daysFebruary: 0 workable days · high 48°F / low 20°F · rain 15% of daysMarch: 0 workable days · high 59°F / low 28°F · rain 17% of daysApril: 0 workable days · high 66°F / low 35°F · rain 25% of daysMay: 19 workable days · high 75°F / low 44°F · rain 33% of daysJune: 21 workable days · high 86°F / low 54°F · rain 28% of daysJuly: 0 workable days · high 92°F / low 59°F · rain 24% of daysAugust: 17 workable days · high 89°F / low 57°F · rain 22% of daysSeptember: 24 workable days · high 82°F / low 49°F · rain 20% of daysOctober: 6 workable days · high 68°F / low 37°F · rain 18% of daysNovember: 0 workable days · high 54°F / low 26°F · rain 14% of daysDecember: 0 workable days · high 43°F / low 18°F · rain 12% of daysJanuary avg high 44°FJanuary avg low 18°FFebruary avg high 48°FFebruary avg low 20°FMarch avg high 59°FMarch avg low 28°FApril avg high 66°FApril avg low 35°FMay avg high 75°FMay avg low 44°FJune avg high 86°FJune avg low 54°FJuly avg high 92°FJuly avg low 59°FAugust avg high 89°FAugust avg low 57°FSeptember avg high 82°FSeptember avg low 49°FOctober avg high 68°FOctober avg low 37°FNovember avg high 54°FNovember avg low 26°FDecember avg high 43°FDecember avg low 18°FJanuary: rain on 12% of daysJFebruary: rain on 15% of daysFMarch: rain on 17% of daysMApril: rain on 25% of daysAMay: rain on 33% of daysMJune: rain on 28% of daysJJuly: rain on 24% of daysJAugust: rain on 22% of daysASeptember: rain on 20% of daysSOctober: rain on 18% of daysONovember: rain on 14% of daysNDecember: rain on 12% of daysD18°55°92°0000192101724600
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
Workable days in Greeley, CO: days meeting the temperature rules, discounted by NOAA rain odds — a 1991–2020 estimate, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 44°F 18°F 12% 0
February 48°F 20°F 15% 0
March 59°F 28°F 17% 0
April 66°F 35°F 25% 0
May 75°F 44°F 33% 19
June 86°F 54°F 28% 21
July 92°F 59°F 24% 0
August 89°F 57°F 22% 17
September 82°F 49°F 20% 24
October 68°F 37°F 18% 6
November 54°F 26°F 14% 0
December 43°F 18°F 12% 0

Greeley compresses the whole concrete pouring year into May through June. Miss those 86 workable days and the next real window is months out: by July, average lows hit 59°F against a 40°F floor. Plan the prep work in advance and treat every GOOD chip as spendable. For the statewide picture, the Colorado page compares peak months city by city.

July here fails on heat, not rain: the average high of 92°F sits over the 90°F label ceiling, and 31 of 31 days typically top 90°F. Midsummer work moves to dawn or waits for September.

The rain odds swing hard across the year — 12% of days in December up to 33% in May. Season the plan accordingly: prep in the wet months, apply in the dry ones.

Sealing the same driveway later? Sealcoating in Greeley wants warmer nights (50°F+) than the pour did.

Numbers above come from NOAA's 1991–2020 normals for Greeley Unc, Co Us, 6.2 km from the city center — close enough that neighborhood microclimates (shade lines, river valleys, urban heat) matter more than station distance. See how these day counts are scored.

Comparing calendars along the loop? See how the season shifts for concrete pouring in Grand Junction, CO, or jump ahead to concrete pouring in Highlands Ranch, CO.

Greeley by the numbers

Prep checklist

  1. Clear the 48-hour rule first: two nights over 40°F. May opens that door in Greeley; December (18°F average lows) slams it.
  2. Set the stage first: forms braced, subgrade compacted and lightly damp, every tool within reach, help confirmed.
  3. Cut plastic sheeting and weight it at the pour's edge — Greeley sees rain on 20% of September days, and the 6-hour rule doesn't negotiate.
  4. Keep the mix stiff (oatmeal, not soup) — every extra quart of water is permanent surface strength lost.
  5. Screed while it sheens, float when the sheen dulls, and never trowel bleed water back in.
  6. Edge and joint with an edger + float set — control joints every 2–3 slab-thicknesses in feet.
  7. Hold the moisture in (sheeting or misting); when June nights dip toward 54°F, a curing blanket is the difference.
  8. Feet after 24–48 h, cars after about a week — and structural work follows engineer/ACI specs, not this list.

Pro moves for Greeley conditions

Gear that saves a window

FTC note: the gear below is unlinked until the affiliate program is switched on. See the affiliate disclosure.

Frequently asked questions

What temperature is too cold to pour concrete?

The line is a 40°F low inside the first 48 hours; an actual freeze (32°F) physically damages young concrete. Greeley's December nights average 18°F — firmly out — while September nights hold near 49°F. Small pours only; structural work follows engineer/ACI specs.

Can you pour concrete before rain?

The engine wants 6 protected hours; light rain later actually feeds the cure. With 33% rain-day odds in May versus 12% in December, Greeley's dry-season pours barely think about this rule and wet-season pours live by the radar. For small DIY pours; structural schedules follow ACI.

How long does concrete need to be protected from freezing?

Keep it above freezing for at least the first 48 hours (the engine calls any sub-40°F low in that window a NO). In Greeley that rules out roughly December-adjacent months entirely and makes shoulder-season pours a two-night forecast decision. DIY scope; anything structural follows engineer/ACI cold-weather practice.

Is it OK to pour concrete in hot weather?

To a 90°F high, yes — with shade, cool mix water, a damp subgrade, and a dawn start. Above 90°F the surface sets while the core is plastic and shrinkage cracks map the slab. Greeley averages 31 such days in July, which is why summer pours here move to first light.

How long before you can drive on new concrete?

A week before tires, 24–48 hours before feet — at September-typical Greeley temperatures (82°F highs). When nights slide toward 18°F, add days: cure speed is temperature. Early loads print permanent marks; the bag's cure table wins every argument.

Best season for concrete work in Greeley?

May through june — the months with 40°F+ nights, sub-90°F days, and manageable rain. September leads at 24 workable days; December bottoms out near 0.

How windy is too windy to pour concrete?

Wind matters as much as temperature. Breezes above about 10 to 15 mph, especially with low humidity or warm sun, can evaporate surface moisture faster than bleed water rises — ACI guidance flags evaporation rates above 0.2 pounds per square foot per hour as plastic-shrinkage-cracking territory. For a small DIY slab, wait for a calm morning or rig windbreaks and fog-mist the air above the surface.

How long should I keep new concrete wet?

Keep it continuously wet for at least 7 days — the moist-curing period ACI guidance specifies for conventional concrete (3 days for high-early mixes). Use soaker hoses, wet burlap, curing blankets, or sheet plastic, or spray on a curing compound after finishing. Concrete allowed to dry out early can lose a large share of its potential strength and is far more likely to dust, scale, and crack.

When can I remove the forms from a small concrete pour?

For slabs, walkways, and post footings, side forms can usually come off 24 to 48 hours after the pour — leave them at least 72 hours when temperatures run below 50°F, since strength gain slows dramatically. Pry against the ground, never the green concrete, and keep curing the exposed edges afterward. Forms supporting structural or suspended concrete follow engineering rules, not DIY timelines.

How soon can I seal new concrete?

Wait until it reaches full cure — about 28 days — before applying most penetrating or acrylic sealers; sealing earlier traps moisture and can cause clouding or poor bond. The exception is a cure-and-seal product designed to go on the day of the pour. Pick a dry stretch with temperatures roughly 50 to 90°F — in Greeley, May typically offers the most reliable window — so the sealer itself cures properly.

Concrete Pouring glossary

Evaporation rate
How fast surface moisture leaves fresh concrete, driven by temperature, wind, and humidity; rates above about 0.2 lb per square foot per hour invite plastic shrinkage cracking.
Plastic shrinkage cracking
Shallow, random cracks forming within hours of placement when the surface dries faster than bleed water can replace it; wind and sun are the usual culprits.
Bleed water
Mix water that rises to the surface after placement; finishing before it evaporates traps it under the trowel, creating a weak, dusty top layer.
Hydration
The chemical reaction between cement and water that hardens concrete; it needs moisture and temperatures above roughly 40°F, and continues gaining strength for weeks.
Curing compound
A sprayed or rolled membrane that seals moisture inside fresh concrete when wet curing isn't practical; some types must be stripped before paint or sealer.
Air entrainment
Microscopic air bubbles added to the mix that give exterior concrete freeze-thaw and deicer resistance; it must be ordered in the mix, not added later.

People also search for

Other projects in Greeley

Concrete Pouring nearby

Guides

Climatology: NOAA 1991–2020 normals via GREELEY UNC, CO US (6.2 km from Greeley center, elevation 4715 ft); live outlook by Open-Meteo.