- 15Cities compared
- AugustStrongest month statewide
- 160 daysLongest calendar: Alton
- 0Year-round cities
Across Illinois's 15 listed cities, annual workable days for deck staining run from 110 (Waukegan) up to 160 (Alton). Every number comes from NOAA 1991–2020 normals scored against the same label ruleset; every city name links to its live 10-day check.
Statewide, August is the strongest month — it tops or ties the table in most listed cities. The live strips on each city page decide the week; this table decides the month. Scoring rules: methodology; the national playbook: the deck staining guide.
Chasing the season across state lines? Step back to Deck Staining in Idaho or push on to Deck Staining in Indiana.
Cities in Illinois
| City | Peak months | Season | Workable days/yr |
|---|---|---|---|
| Chicago | Aug, Jul, Sep | April–October | 133 |
| Rockford | Aug, Jul, Sep | May–October | 123 |
| Round Lake Beach | Aug, Jul, Sep | May–October | 124 |
| Peoria | Aug, Sep, Jul | April–October | 137 |
| Aurora | Aug, Jul, Sep | May–October | 127 |
| Springfield | Aug, Sep, Jul | April–October | 133 |
| Champaign | Aug, Sep, Jul | April–October | 130 |
| Naperville | Aug, Jul, Sep | May–October | 129 |
| Joliet | Aug, Sep, Jul | May–October | 128 |
| Bloomington | Jul, Aug, Sep | May–October | 126 |
| Elgin | Aug, Jul, Sep | May–October | 116 |
| Waukegan | Jul, Aug, Sep | May–October | 110 |
| Cicero | Aug, Jul, Sep | April–October | 133 |
| Alton | Aug, Jul, Sep | April–October | 160 |
| Decatur | Aug, Sep, Jul | April–October | 141 |
Top 10 Illinois calendars for deck staining
The rules behind these numbers
| Check | Threshold | Why it matters |
|---|---|---|
| Air temperature | 50–90°F | Air temperature while applying and for the first hours of dry time. |
| Overnight low | ≥40°F during the first 24 h | Overnight low during the cure window. |
| Dry before | ≤0.05" rain in the prior 24 h; watch back to 48 h | Wood must dry out after rain before it can absorb stain. |
| Dry after | <0.05" rain for 24 h after (48 h oil-based formulas want 48 h dry) | Water-based stains need roughly 24 dry hours; oil-based closer to 48. |
| Evening dew-point spread | ≥5°F from 6–11 pm | Temperature minus dew point from 6 pm to 11 pm. A small spread means dew will settle on fresh stain. |
| Daytime humidity | ≤85% | Daytime relative humidity slows dry time. |
| Wind | ≤15 mph (brush or pad only up to 20 mph) | Above 15 mph, spraying drifts; above 20 mph, dust and debris land in wet stain. |
Always follow your product label — formulas vary. The table above is the typical range across major manufacturers, not a promise about your can.