Exterior Painting Weather in Longmont, CO: 10-Day Windows & Best Months

Longmont gives you roughly 83 workable exterior painting days a year, concentrated May through June. The single best month is August, averaging 22 days that clear every check — highs of 88°F, lows near 54°F, and a 23% daily rain chance. Below: the live 10-day check and Longmont's full month-by-month table.

Best month: June · 22 workable days

The next 10 days in Longmont

GOOD — a clean label day MARGINAL — one borderline check NO — hard fail or stacked flags

The rules this check uses

The engine scores every Longmont day against this table — typical latex-label numbers, with 35–50°F highs flagged for low-temperature formulas.

Typical label thresholds for exterior painting — the ruleset behind every Longmont verdict above.
CheckThresholdWhy it matters
Air temperature 50–90°F (low-temp formulas from 35°F) Standard latex wants 50°F+. Some low-temperature formulas are rated down to 35°F.
Overnight low ≥35°F during the first 24 h (≥40°F preferred) Paint keeps curing overnight; a low under 40°F stalls standard latex.
Dry before ≤0.05" rain in the prior 12 h; watch back to 24 h What fell before you start matters as much as what falls after — surfaces hold water invisibly.
Dry after <0.05" rain for 24 h after The make-or-break window: rain here undoes the work, not just delays it.
Evening dew-point spread ≥5°F from 6–11 pm Surface should stay at least 5°F above the dew point; dew flat-spots fresh paint.
Daytime humidity ≤80% Humid air slows evaporation, stretching dry times into the risky evening hours.
Wind ≤15 mph (brush only up to 20 mph) Scored on the windiest working hour; the marginal band changes the method, not the day.

Always follow your product label — formulas vary. Treat the table as the consensus range across brands — the label in your hand is the final word.

Best months for exterior painting in Longmont

January: 0 workable days · high 44°F / low 14°F · rain 12% of daysFebruary: 0 workable days · high 47°F / low 17°F · rain 16% of daysMarch: 0 workable days · high 57°F / low 26°F · rain 17% of daysApril: 0 workable days · high 63°F / low 32°F · rain 24% of daysMay: 14 workable days · high 73°F / low 41°F · rain 31% of daysJune: 22 workable days · high 84°F / low 50°F · rain 28% of daysJuly: 3 workable days · high 91°F / low 55°F · rain 22% of daysAugust: 22 workable days · high 88°F / low 54°F · rain 23% of daysSeptember: 22 workable days · high 80°F / low 46°F · rain 21% of daysOctober: 0 workable days · high 66°F / low 33°F · rain 18% of daysNovember: 0 workable days · high 54°F / low 24°F · rain 15% of daysDecember: 0 workable days · high 45°F / low 14°F · rain 10% of daysJanuary avg high 44°FJanuary avg low 14°FFebruary avg high 47°FFebruary avg low 17°FMarch avg high 57°FMarch avg low 26°FApril avg high 63°FApril avg low 32°FMay avg high 73°FMay avg low 41°FJune avg high 84°FJune avg low 50°FJuly avg high 91°FJuly avg low 55°FAugust avg high 88°FAugust avg low 54°FSeptember avg high 80°FSeptember avg low 46°FOctober avg high 66°FOctober avg low 33°FNovember avg high 54°FNovember avg low 24°FDecember avg high 45°FDecember avg low 14°FJanuary: rain on 12% of daysJFebruary: rain on 16% of daysFMarch: rain on 17% of daysMApril: rain on 24% of daysAMay: rain on 31% of daysMJune: rain on 28% of daysJJuly: rain on 22% of daysJAugust: rain on 23% of daysASeptember: rain on 21% of daysSOctober: rain on 18% of daysONovember: rain on 15% of daysNDecember: rain on 10% of daysD14°52°91°0000142232222000
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
How Longmont months rank: temperature-rule days minus NOAA rain odds, from 1991–2020 normals. An estimate for planning, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 44°F 14°F 12% 0
February 47°F 17°F 16% 0
March 57°F 26°F 17% 0
April 63°F 32°F 24% 0
May 73°F 41°F 31% 14
June 84°F 50°F 28% 22
July 91°F 55°F 22% 3
August 88°F 54°F 23% 22
September 80°F 46°F 21% 22
October 66°F 33°F 18% 0
November 54°F 24°F 15% 0
December 45°F 14°F 10% 0

Longmont compresses the whole exterior painting year into May through June. Miss those 83 workable days and the next real window is months out: by July, average lows hit 55°F against a 40°F floor. Plan the prep work in advance and treat every GOOD chip as spendable. Neighboring towns shift by a month or more — the Colorado comparison shows where Longmont sits.

July here fails on heat, not rain: the average high of 91°F sits over the 90°F label ceiling, and 27 of 31 days typically top 90°F. Midsummer work moves to dawn or waits for August.

The rain odds swing hard across the year — 10% of days in December up to 31% in May. Season the plan accordingly: prep in the wet months, apply in the dry ones.

If the walls pass, the roof might too: roof coating in Longmont uses the same film chemistry with tighter dew and wind limits.

Climatology here is measured at Longmont 2 Ese, Co Us (2.0 km away). Treat the monthly numbers as the neighborhood average; a shaded north-side deck runs colder and damper than any of them. The exact formula lives in the methodology.

The loop continues nearby: check exterior painting weather in Lakewood, CO one stop back, or Pueblo, CO’s exterior painting windows one stop ahead.

Longmont by the numbers

Prep checklist

  1. Find application day plus 24 dry hours with nights at 40°F+; Longmont offers that pairing most often in August (22 workable days).
  2. Wash the wall and scrape everything loose; paint bonds to substrate, not chalk.
  3. Give washed siding 24 hours — north walls in Longmont can need double after a May-grade soak.
  4. An ir surface thermometer settles arguments: label limits bind the wall surface, which outruns Longmont's air by 20°F+ in sun.
  5. Spot-prime bare wood and bleed-through, then caulk the gaps on a touch-dry surface.
  6. Sequence walls so you always paint in shade; midday sun skins latex before it levels.
  7. Cut in with an angled brush set, roll a wet edge, and drop the sprayer plan over 15 mph.
  8. Stop 2 hours before sunset: with August lows near 54°F, Longmont's siding meets the dew point before the late news.

Pro moves for Longmont conditions

Gear that saves a window

Heads up: product links on this page may become affiliate links when the program is enabled. See the affiliate disclosure.

Frequently asked questions

What temperature can you paint outside?

50–90°F for standard formulas, 35°F+ for low-temp lines, and the wall itself must stay 5°F above the dew point. In Longmont the practical range is set by nights: the 40°F overnight floor arrives around May and leaves after September.

How many dry hours does exterior paint need before rain?

Plan 24 rain-free hours after the last coat; the engine fails any day that can't deliver them. With Longmont's rain odds swinging from 10% of days in December to 31% in May, the strip above is mostly a search for that dry pair.

Why does dew ruin fresh paint?

Fresh latex needs hours before it can take standing water; evening condensation gets there first on cooling siding. The check: air minus dew point from 6–11 p.m., 5°F or better. Humid May evenings in Longmont are when GOOD afternoons hide failing nights.

Can you paint in high humidity?

Up to about 80% daytime RH — above that, dry times stretch until the film meets the evening dew. 80–83% reads MARGINAL on the engine; more is a fail. Pair humidity with Longmont's dew-point spread rule and paint mornings-into-early-afternoons in the humid months.

What is surface temperature vs air temperature?

Two different numbers: air (what the app shows) and the wall (what the paint feels). Sun adds 20°F or more; evening radiational cooling subtracts. That's why the engine checks the 90°F top on Longmont's hot afternoons and the dew-point spread after sunset — both are surface problems the air forecast hides.

When does painting season end in Longmont?

When nights stop clearing 40°F — in Longmont that's typically after June, when average lows hit 50°F and falling. Low-temp formulas (35°F rated) buy a few extra weeks; the engine shows them as MARGINAL days before the hard close.

What humidity is too high for exterior painting?

Most acrylic paints apply well between 40 and 70 percent relative humidity. Above about 85 percent, water can't evaporate from the film, so drying stalls, sags develop, and surfactants rise as sticky brown streaks. Very low humidity under 20 percent causes the opposite problem — paint dries too fast to level. Check the hourly forecast for Longmont and aim for a falling-humidity afternoon.

What is the dew point rule for exterior painting?

Coating manufacturers require the surface to be at least 5°F above the dew point during application and initial drying. Closer than that, an invisible film of condensation forms on the siding, which ruins adhesion and can flash-rust bare metal. Practically, start after morning dew has fully evaporated and stop early enough that paint is set before the evening temperature drop.

How windy is too windy to paint outside?

Sustained winds above about 15 mph make brushing and rolling risky: paint skins before it levels, lap marks multiply, and dust or pollen embeds in the wet film. Spraying is far more sensitive — overspray drifts onto cars and neighbors above roughly 5 to 10 mph. Wind also accelerates drying, shortening your wet edge, so pick calm mornings for large walls.

Why is my fresh exterior paint blistering?

Heat blisters form when paint is applied to siding baking in direct sun — the surface skins over, then trapped solvent or water vaporizes underneath. Moisture blisters appear when paint goes over damp wood or when interior moisture pushes outward. Paint shaded sides, keep surfaces under about 90°F, and let rain-soaked siding dry a day or two before coating.

Exterior Painting glossary

Dew point spread
The gap between air temperature and dew point; painting standards call for surfaces at least 5°F above the dew point to prevent invisible condensation under fresh paint.
Surfactant leaching
Sticky brown or glossy streaks that surface when latex paint dries in cool, damp conditions; usually cosmetic and rinses off after the paint fully cures.
Wet edge
Keeping the boundary of just-applied paint wet so the next stroke blends invisibly; heat, wind, and low humidity shorten it and cause lap marks.
Surface temperature
The actual temperature of siding, which can run 20 to 40°F above air temperature in direct sun; paint labels' limits apply to the surface, not the forecast.
Full cure
The point when paint reaches final hardness and washability — typically 2 to 4 weeks for exterior acrylics — distinct from dry-to-touch, which takes only hours.
Blocking
Fresh paint sticking to itself where surfaces touch, like doors against jambs; worst in heat and humidity before the film fully cures.