Exterior Painting Weather in Terre Haute, IN: 10-Day Windows & Best Months

Terre Haute gives you roughly 130 workable exterior painting days a year, concentrated April through October. The single best month is September, averaging 21 days that clear every check — highs of 79°F, lows near 54°F, and a 29% daily rain chance. Below: the live 10-day check and Terre Haute's full month-by-month table.

Best month: July · 20 workable days

The next 10 days in Terre Haute

GOOD — a clean label day MARGINAL — one borderline check NO — hard fail or stacked flags

The rules this check uses

The engine scores every Terre Haute day against this table — typical latex-label numbers, with 35–50°F highs flagged for low-temperature formulas.

Typical label thresholds for exterior painting — the ruleset behind every Terre Haute verdict above.
CheckThresholdWhy it matters
Air temperature 50–90°F (low-temp formulas from 35°F) Standard latex wants 50°F+. Some low-temperature formulas are rated down to 35°F.
Overnight low ≥35°F during the first 24 h (≥40°F preferred) Paint keeps curing overnight; a low under 40°F stalls standard latex.
Dry before ≤0.05" rain in the prior 12 h; watch back to 24 h What fell before you start matters as much as what falls after — surfaces hold water invisibly.
Dry after <0.05" rain for 24 h after The make-or-break window: rain here undoes the work, not just delays it.
Evening dew-point spread ≥5°F from 6–11 pm Surface should stay at least 5°F above the dew point; dew flat-spots fresh paint.
Daytime humidity ≤80% Humid air slows evaporation, stretching dry times into the risky evening hours.
Wind ≤15 mph (brush only up to 20 mph) Scored on the windiest working hour; the marginal band changes the method, not the day.

Always follow your product label — formulas vary. Treat the table as the consensus range across brands — the label in your hand is the final word.

Best months for exterior painting in Terre Haute

January: 0 workable days · high 37°F / low 21°F · rain 30% of daysFebruary: 0 workable days · high 42°F / low 24°F · rain 31% of daysMarch: 0 workable days · high 53°F / low 33°F · rain 34% of daysApril: 14 workable days · high 65°F / low 43°F · rain 39% of daysMay: 18 workable days · high 75°F / low 53°F · rain 42% of daysJune: 18 workable days · high 83°F / low 62°F · rain 39% of daysJuly: 20 workable days · high 86°F / low 65°F · rain 36% of daysAugust: 21 workable days · high 85°F / low 62°F · rain 32% of daysSeptember: 21 workable days · high 79°F / low 54°F · rain 29% of daysOctober: 18 workable days · high 67°F / low 43°F · rain 30% of daysNovember: 0 workable days · high 53°F / low 34°F · rain 30% of daysDecember: 0 workable days · high 41°F / low 26°F · rain 32% of daysJanuary avg high 37°FJanuary avg low 21°FFebruary avg high 42°FFebruary avg low 24°FMarch avg high 53°FMarch avg low 33°FApril avg high 65°FApril avg low 43°FMay avg high 75°FMay avg low 53°FJune avg high 83°FJune avg low 62°FJuly avg high 86°FJuly avg low 65°FAugust avg high 85°FAugust avg low 62°FSeptember avg high 79°FSeptember avg low 54°FOctober avg high 67°FOctober avg low 43°FNovember avg high 53°FNovember avg low 34°FDecember avg high 41°FDecember avg low 26°FJanuary: rain on 30% of daysJFebruary: rain on 31% of daysFMarch: rain on 34% of daysMApril: rain on 39% of daysAMay: rain on 42% of daysMJune: rain on 39% of daysJJuly: rain on 36% of daysJAugust: rain on 32% of daysASeptember: rain on 29% of daysSOctober: rain on 30% of daysONovember: rain on 30% of daysNDecember: rain on 32% of daysD21°53°86°0001418182021211800
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
How Terre Haute months rank: temperature-rule days minus NOAA rain odds, from 1991–2020 normals. An estimate for planning, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 37°F 21°F 30% 0
February 42°F 24°F 31% 0
March 53°F 33°F 34% 0
April 65°F 43°F 39% 14
May 75°F 53°F 42% 18
June 83°F 62°F 39% 18
July 86°F 65°F 36% 20
August 85°F 62°F 32% 21
September 79°F 54°F 29% 21
October 67°F 43°F 30% 18
November 53°F 34°F 30% 0
December 41°F 26°F 32% 0

Figure 130 workable days a year in Terre Haute, spread across April through October. Shoulder months turn on the overnight rule: an afternoon at 65°F passes, but the 40°F night floor is what actually opens the season in April. Neighboring towns shift by a month or more — the Indiana comparison shows where Terre Haute sits.

If the walls pass, the roof might too: roof coating in Terre Haute uses the same film chemistry with tighter dew and wind limits.

Climatology here is measured at Terre Haute Hulman Rgnl Ap, In Us (5.2 km away). Treat the monthly numbers as the neighborhood average; a shaded north-side deck runs colder and damper than any of them. The exact formula lives in the methodology.

Comparing calendars along the loop? See how the season shifts for exterior painting in South Bend, IN, or jump ahead to exterior painting in Cedar Rapids, IA.

Terre Haute by the numbers

Prep checklist

  1. Find application day plus 24 dry hours with nights at 40°F+; Terre Haute offers that pairing most often in September (21 workable days).
  2. Wash the wall and scrape everything loose; paint bonds to substrate, not chalk.
  3. Give washed siding 24 hours — north walls in Terre Haute can need double after a May-grade soak.
  4. An ir surface thermometer settles arguments: label limits bind the wall surface, which outruns Terre Haute's air by 20°F+ in sun.
  5. Spot-prime bare wood and bleed-through, then caulk the gaps on a touch-dry surface.
  6. Sequence walls so you always paint in shade; midday sun skins latex before it levels.
  7. Cut in with an angled brush set, roll a wet edge, and drop the sprayer plan over 15 mph.
  8. Stop 2 hours before sunset: with September lows near 54°F, Terre Haute's siding meets the dew point before the late news.

Pro moves for Terre Haute conditions

Gear that saves a window

Heads up: product links on this page may become affiliate links when the program is enabled. See the affiliate disclosure.

Frequently asked questions

What temperature can you paint outside?

50–90°F for standard formulas, 35°F+ for low-temp lines, and the wall itself must stay 5°F above the dew point. In Terre Haute the practical range is set by nights: the 40°F overnight floor arrives around April and leaves after October.

How many dry hours does exterior paint need before rain?

Plan 24 rain-free hours after the last coat; the engine fails any day that can't deliver them. With Terre Haute's rain odds swinging from 29% of days in September to 42% in May, the strip above is mostly a search for that dry pair.

Why does dew ruin fresh paint?

Fresh latex needs hours before it can take standing water; evening condensation gets there first on cooling siding. The check: air minus dew point from 6–11 p.m., 5°F or better. Humid May evenings in Terre Haute are when GOOD afternoons hide failing nights.

Can you paint in high humidity?

Up to about 80% daytime RH — above that, dry times stretch until the film meets the evening dew. 80–83% reads MARGINAL on the engine; more is a fail. Pair humidity with Terre Haute's dew-point spread rule and paint mornings-into-early-afternoons in the humid months.

What is surface temperature vs air temperature?

Two different numbers: air (what the app shows) and the wall (what the paint feels). Sun adds 20°F or more; evening radiational cooling subtracts. That's why the engine checks the 90°F top on Terre Haute's hot afternoons and the dew-point spread after sunset — both are surface problems the air forecast hides.

When does painting season end in Terre Haute?

When nights stop clearing 40°F — in Terre Haute that's typically after October, when average lows hit 43°F and falling. Low-temp formulas (35°F rated) buy a few extra weeks; the engine shows them as MARGINAL days before the hard close.

What humidity is too high for exterior painting?

Most acrylic paints apply well between 40 and 70 percent relative humidity. Above about 85 percent, water can't evaporate from the film, so drying stalls, sags develop, and surfactants rise as sticky brown streaks. Very low humidity under 20 percent causes the opposite problem — paint dries too fast to level. Check the hourly forecast for Terre Haute and aim for a falling-humidity afternoon.

What is the dew point rule for exterior painting?

Coating manufacturers require the surface to be at least 5°F above the dew point during application and initial drying. Closer than that, an invisible film of condensation forms on the siding, which ruins adhesion and can flash-rust bare metal. Practically, start after morning dew has fully evaporated and stop early enough that paint is set before the evening temperature drop.

How windy is too windy to paint outside?

Sustained winds above about 15 mph make brushing and rolling risky: paint skins before it levels, lap marks multiply, and dust or pollen embeds in the wet film. Spraying is far more sensitive — overspray drifts onto cars and neighbors above roughly 5 to 10 mph. Wind also accelerates drying, shortening your wet edge, so pick calm mornings for large walls.

Why is my fresh exterior paint blistering?

Heat blisters form when paint is applied to siding baking in direct sun — the surface skins over, then trapped solvent or water vaporizes underneath. Moisture blisters appear when paint goes over damp wood or when interior moisture pushes outward. Paint shaded sides, keep surfaces under about 90°F, and let rain-soaked siding dry a day or two before coating.

Exterior Painting glossary

Dew point spread
The gap between air temperature and dew point; painting standards call for surfaces at least 5°F above the dew point to prevent invisible condensation under fresh paint.
Surfactant leaching
Sticky brown or glossy streaks that surface when latex paint dries in cool, damp conditions; usually cosmetic and rinses off after the paint fully cures.
Wet edge
Keeping the boundary of just-applied paint wet so the next stroke blends invisibly; heat, wind, and low humidity shorten it and cause lap marks.
Surface temperature
The actual temperature of siding, which can run 20 to 40°F above air temperature in direct sun; paint labels' limits apply to the surface, not the forecast.
Full cure
The point when paint reaches final hardness and washability — typically 2 to 4 weeks for exterior acrylics — distinct from dry-to-touch, which takes only hours.
Blocking
Fresh paint sticking to itself where surfaces touch, like doors against jambs; worst in heat and humidity before the film fully cures.

People also search for