WorkWindow

Exterior Painting · Utah

Exterior Painting Weather in South Jordan, UT: 10-Day Windows & Best Months

South Jordan gives you roughly 123 workable exterior painting days a year, concentrated April through October. June leads the calendar with 25 workable days: average high 82°F, low 57°F, rain on 18% of days. Below: the live 10-day check and South Jordan's full month-by-month table.

Best month: May · 22 workable days

The next 10 days in South Jordan

GOOD — a clean label day MARGINAL — one borderline check NO — hard fail or stacked flags

The rules this check uses

The engine scores every South Jordan day against this table — typical latex-label numbers, with 35–50°F highs flagged for low-temperature formulas.

Typical label thresholds for exterior painting — the ruleset behind every South Jordan verdict above.
CheckThresholdWhy it matters
Air temperature 50–90°F (low-temp formulas from 35°F) Standard latex wants 50°F+. Some low-temperature formulas are rated down to 35°F.
Overnight low ≥35°F during the first 24 h (≥40°F preferred) Paint keeps curing overnight; a low under 40°F stalls standard latex.
Dry before ≤0.05" rain in the prior 12 h; watch back to 24 h What fell before you start matters as much as what falls after — surfaces hold water invisibly.
Dry after <0.05" rain for 24 h after The make-or-break window: rain here undoes the work, not just delays it.
Evening dew-point spread ≥5°F from 6–11 pm Surface should stay at least 5°F above the dew point; dew flat-spots fresh paint.
Daytime humidity ≤80% Humid air slows evaporation, stretching dry times into the risky evening hours.
Wind ≤15 mph (brush only up to 20 mph) Scored on the windiest working hour; the marginal band changes the method, not the day.

Always follow your product label — formulas vary. Treat the table as the consensus range across brands — the label in your hand is the final word.

Best months for exterior painting in South Jordan

January: 0 workable days · high 38°F / low 23°F · rain 29% of daysFebruary: 0 workable days · high 44°F / low 27°F · rain 29% of daysMarch: 0 workable days · high 54°F / low 34°F · rain 29% of daysApril: 8 workable days · high 61°F / low 40°F · rain 32% of daysMay: 22 workable days · high 71°F / low 48°F · rain 29% of daysJune: 25 workable days · high 82°F / low 57°F · rain 18% of daysJuly: 8 workable days · high 91°F / low 68°F · rain 11% of daysAugust: 18 workable days · high 89°F / low 66°F · rain 15% of daysSeptember: 24 workable days · high 79°F / low 56°F · rain 20% of daysOctober: 18 workable days · high 64°F / low 43°F · rain 24% of daysNovember: 0 workable days · high 49°F / low 32°F · rain 27% of daysDecember: 0 workable days · high 38°F / low 23°F · rain 29% of daysJanuary avg high 38°FJanuary avg low 23°FFebruary avg high 44°FFebruary avg low 27°FMarch avg high 54°FMarch avg low 34°FApril avg high 61°FApril avg low 40°FMay avg high 71°FMay avg low 48°FJune avg high 82°FJune avg low 57°FJuly avg high 91°FJuly avg low 68°FAugust avg high 89°FAugust avg low 66°FSeptember avg high 79°FSeptember avg low 56°FOctober avg high 64°FOctober avg low 43°FNovember avg high 49°FNovember avg low 32°FDecember avg high 38°FDecember avg low 23°FJanuary: rain on 29% of daysJFebruary: rain on 29% of daysFMarch: rain on 29% of daysMApril: rain on 32% of daysAMay: rain on 29% of daysMJune: rain on 18% of daysJJuly: rain on 11% of daysJAugust: rain on 15% of daysASeptember: rain on 20% of daysSOctober: rain on 24% of daysONovember: rain on 27% of daysNDecember: rain on 29% of daysD23°57°91°00082225818241800
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
How South Jordan months rank: temperature-rule days minus NOAA rain odds, from 1991–2020 normals. An estimate for planning, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 38°F 23°F 29% 0
February 44°F 27°F 29% 0
March 54°F 34°F 29% 0
April 61°F 40°F 32% 8
May 71°F 48°F 29% 22
June 82°F 57°F 18% 25
July 91°F 68°F 11% 8
August 89°F 66°F 15% 18
September 79°F 56°F 20% 24
October 64°F 43°F 24% 18
November 49°F 32°F 27% 0
December 38°F 23°F 29% 0

The working season runs April through October — about 123 workable days a year. The edges are night-limited: label rules want overnight lows of 40°F+, and South Jordan's nights only average that from May to October. Neighboring towns shift by a month or more — the Utah comparison shows where South Jordan sits.

Midsummer is the trap month in South Jordan — 91°F average highs against a 90°F limit. The best-months table is honest about it: June beats July with 25 workable days to 8.

South Jordan has a real wet/dry rhythm: April brings rain on 32% of days versus 11% in July. When the calendar gives you a July-side window, the dry-before and dry-after rules nearly take care of themselves.

Related check: roof coating in South Jordan — same 50–90°F chemistry, but roofs hit the dew point first and wind is a safety stop.

Climatology here is measured at Cottonwood Weir, Ut Us (17.8 km away). Treat the monthly numbers as the neighborhood average; a shaded north-side deck runs colder and damper than any of them. The exact formula lives in the methodology.

Comparing calendars along the loop? See how the season shifts for exterior painting in Sandy, UT, or jump ahead to exterior painting in St. George, UT.

South Jordan by the numbers

Prep checklist

  1. Two clean days beat one perfect one: 24 h of dry cure and a 40°F+ night — June is South Jordan's highest-odds month (25 days).
  2. Wash the wall and scrape everything loose; paint bonds to substrate, not chalk.
  3. Give washed siding 24 hours — north walls in South Jordan can need double after a April-grade soak.
  4. Read the wall, not the app: an ir surface thermometer on sunlit siding shows 20°F+ over South Jordan's reported 82°F.
  5. Spot-prime bare wood and bleed-through, then caulk the gaps on a touch-dry surface.
  6. Follow the shade around the house — never a wall in direct midday sun.
  7. Cut in with an angled brush set, roll a wet edge, and drop the sprayer plan over 15 mph.
  8. Stop 2 hours before sunset: with June lows near 57°F, South Jordan's siding meets the dew point before the late news.

Pro moves for South Jordan conditions

Gear that saves a window

Heads up: product links on this page may become affiliate links when the program is enabled. See the affiliate disclosure.

Frequently asked questions

What temperature can you paint outside?

Standard latex: 50–90°F with nights of 40°F+; low-temperature formulas are rated down to 35°F and the engine marks 35–50°F highs as MARGINAL for exactly that reason. South Jordan's edge months live in that band — April averages 61°F highs over 40°F nights.

How many dry hours does exterior paint need before rain?

About 24 — a 0.05"+ shower inside that window streaks or washes fresh latex. South Jordan offers those 24-hour dry runs most reliably in July (rain on just 11% of days); April is the gamble at 32%.

Why does dew ruin fresh paint?

Because a film that hasn't coalesced can't shed water: on cooling South Jordan siding, dew flat-spots the sheen and drags surfactants out in streaks. It forms when the wall reaches the dew point — the engine wants a 5°F spread from 6–11 p.m. Finish 2 hours before sunset and latex gets its lead time.

Can you paint in high humidity?

The label limit is ~80% relative humidity, and it compounds: humid air slows the cure, which pushes wet film into dew hours. The engine flags 80–83% and fails beyond. In South Jordan, the drier July air makes this a non-issue; muggy spells make it the day-killer.

What is surface temperature vs air temperature?

The forecast reports air; the label limits the wall. In direct sun a wall runs 20°F+ hotter — a 91°F South Jordan July day can put a west wall past the 90°F ceiling by mid-afternoon. Follow the shade around the house and check the surface by hand or IR thermometer.

When does painting season end in South Jordan?

The closing bell is the overnight floor. October is the last month averaging viable nights (43°F lows); after that, even warm afternoons sit on failing nights. Spring reopens around April from the same rule.

What humidity is too high for exterior painting?

Most acrylic paints apply well between 40 and 70 percent relative humidity. Above about 85 percent, water can't evaporate from the film, so drying stalls, sags develop, and surfactants rise as sticky brown streaks. Very low humidity under 20 percent causes the opposite problem — paint dries too fast to level. Check the hourly forecast for South Jordan and aim for a falling-humidity afternoon.

What is the dew point rule for exterior painting?

Coating manufacturers require the surface to be at least 5°F above the dew point during application and initial drying. Closer than that, an invisible film of condensation forms on the siding, which ruins adhesion and can flash-rust bare metal. Practically, start after morning dew has fully evaporated and stop early enough that paint is set before the evening temperature drop.

How windy is too windy to paint outside?

Sustained winds above about 15 mph make brushing and rolling risky: paint skins before it levels, lap marks multiply, and dust or pollen embeds in the wet film. Spraying is far more sensitive — overspray drifts onto cars and neighbors above roughly 5 to 10 mph. Wind also accelerates drying, shortening your wet edge, so pick calm mornings for large walls.

Why is my fresh exterior paint blistering?

Heat blisters form when paint is applied to siding baking in direct sun — the surface skins over, then trapped solvent or water vaporizes underneath. Moisture blisters appear when paint goes over damp wood or when interior moisture pushes outward. Paint shaded sides, keep surfaces under about 90°F, and let rain-soaked siding dry a day or two before coating.

Exterior Painting glossary

Dew point spread
The gap between air temperature and dew point; painting standards call for surfaces at least 5°F above the dew point to prevent invisible condensation under fresh paint.
Surfactant leaching
Sticky brown or glossy streaks that surface when latex paint dries in cool, damp conditions; usually cosmetic and rinses off after the paint fully cures.
Wet edge
Keeping the boundary of just-applied paint wet so the next stroke blends invisibly; heat, wind, and low humidity shorten it and cause lap marks.
Surface temperature
The actual temperature of siding, which can run 20 to 40°F above air temperature in direct sun; paint labels' limits apply to the surface, not the forecast.
Full cure
The point when paint reaches final hardness and washability — typically 2 to 4 weeks for exterior acrylics — distinct from dry-to-touch, which takes only hours.
Blocking
Fresh paint sticking to itself where surfaces touch, like doors against jambs; worst in heat and humidity before the film fully cures.

People also search for

Other projects in South Jordan

Exterior Painting nearby

Guides

Climatology: NOAA 1991–2020 normals via COTTONWOOD WEIR, UT US (17.8 km from South Jordan center, elevation 4986 ft); live outlook by Open-Meteo.