Concrete Pouring Weather in Hollywood, FL: 10-Day Windows & Best Months
By NOAA 1991–2020 normals, Hollywood keeps a concrete pouring window open in all 12 months — a year-round season few US cities match. The single best month is March, averaging 25 days that clear every check — highs of 79°F, lows near 63°F, and a 20% daily rain chance. Below: the live 10-day check and Hollywood's full month-by-month table.
GOOD — a clean label day MARGINAL — one borderline check NO — hard fail or stacked flags
The rules this check uses
Typical bagged-mix requirements for small DIY pours, scored against Hollywood's forecast above. The 48-hour freeze rule dominates every other row; structural work follows engineer/ACI specs instead of this table.
| Check | Threshold | Why it matters |
|---|---|---|
| Air temperature | 40–90°F — ideal 50–85°F | DIY pours work from 40–90°F; 50–85°F is the sweet spot. |
| Overnight low | ≥40°F during the first 48 h | A low under 40°F inside the first 48 hours puts you in cold-weather concreting — not a DIY window. |
| Dry before | no soaking (≥1.0") in the prior 24 h | What fell before you start matters as much as what falls after — surfaces hold water invisibly. |
| Dry after | <0.1" rain for 6 h after (12 h light rain after finishing still risks surface marks) | The make-or-break window: rain here undoes the work, not just delays it. |
| Wind | ≤20 mph (rapid surface drying up to 28 mph) | Scored on the windiest working hour; the marginal band changes the method, not the day. |
Always follow your product label — formulas vary. Treat the table as the consensus range across brands — the label in your hand is the final word.
Best months for concrete pouring in Hollywood
| Month | Avg high | Avg low | Rain odds/day | Workable days | |
|---|---|---|---|---|---|
| January | 76°F | 59°F | 23% | 24 | |
| February | 77°F | 60°F | 20% | 23 | |
| March | 79°F | 63°F | 20% | 25 | |
| April | 82°F | 68°F | 24% | 23 | |
| May | 85°F | 72°F | 35% | 20 | |
| June | 88°F | 75°F | 47% | 16 | |
| July | 90°F | 76°F | 49% | 16 | |
| August | 90°F | 77°F | 50% | 9 | |
| September | 88°F | 76°F | 52% | 14 | |
| October | 85°F | 73°F | 42% | 18 | |
| November | 81°F | 67°F | 33% | 20 | |
| December | 78°F | 62°F | 27% | 23 |
Hollywood's calendar never really closes: even January, the leanest month, averages 24 workable days against the 40–90°F rules. The 10-day strip above matters more here than any season chart. Neighboring towns shift by a month or more — the Florida comparison shows where Hollywood sits.
Summer's enemy here is the rain gauge: July sees measurable rain on 49% of days, so back-to-back dry 6-hour cure windows come in streaks, not on schedule. The 10-day strip earns its keep in September (52% wet days).
The rain odds swing hard across the year — 20% of days in February up to 52% in September. Season the plan accordingly: prep in the wet months, apply in the dry ones.
Sealing the same driveway later? Sealcoating in Hollywood wants warmer nights (50°F+) than the pour did.
Climatology here is measured at Hollywood, Fl Us (3.4 km away). Treat the monthly numbers as the neighborhood average; a shaded north-side deck runs colder and damper than any of them. The exact formula lives in the methodology.
Hollywood by the numbers
- Peak heat lands in August: 90°F average highs and 12 ninety-degree days.
- January bottoms the Hollywood year: 76°F days, 59°F nights.
- Rain-day odds swing from 20% in February to 52% in September.
- Annual workable concrete pouring days: about 231 of 365.
Prep checklist
- Clear the 48-hour rule first: two nights over 40°F. March opens that door in Hollywood; January (59°F average lows) slams it.
- Stage everything before mixing: forms braced, base compacted and damp, tools rinsed, help booked.
- Cut plastic sheeting and weight it at the pour's edge — Hollywood sees rain on 20% of March days, and the 6-hour rule doesn't negotiate.
- Resist the watery mix: it finishes easier today and dusts forever after. Low slump wins.
- Work the sequence: screed on the sheen, float as it dulls, and leave bleed water alone.
- Edge and joint with an edger + float set — control joints every 2–3 slab-thicknesses in feet.
- Hold the moisture in (sheeting or misting); when March nights dip toward 63°F, a curing blanket is the difference.
- Traffic schedule: feet at 24–48 hours, tires near day 7. Anything structural runs on engineer/ACI specs, not this checklist.
Gear that saves a window
Heads up: product links on this page may become affiliate links when the program is enabled. See the affiliate disclosure.
-
Curing blanket
Holds heat through cold nights in the critical 48 hours.
-
IR surface thermometer
Track slab temperature, not just the forecast.
-
Plastic sheeting
Emergency rain cover and moisture-holding cure layer.
-
Edger + float set
Rounded edges and a flat surface before it sets.
-
Concrete mix
An 80-lb bag yields about 0.6 cu ft — do the math twice.
FAQ
What temperature is too cold to pour concrete?
The line is a 40°F low inside the first 48 hours; an actual freeze (32°F) physically damages young concrete. Hollywood's January nights average 59°F — firmly out — while March nights hold near 63°F. Small pours only; structural work follows engineer/ACI specs.
Can you pour concrete before rain?
The engine wants 6 protected hours; light rain later actually feeds the cure. With 52% rain-day odds in September versus 20% in February, Hollywood's dry-season pours barely think about this rule and wet-season pours live by the radar. For small DIY pours; structural schedules follow ACI.
How long does concrete need to be protected from freezing?
Keep it above freezing for at least the first 48 hours (the engine calls any sub-40°F low in that window a NO). In Hollywood that rules out roughly January-adjacent months entirely and makes shoulder-season pours a two-night forecast decision. DIY scope; anything structural follows engineer/ACI cold-weather practice.
Is it OK to pour concrete in hot weather?
To a 90°F high, yes — with shade, cool mix water, a damp subgrade, and a dawn start. Above 90°F the surface sets while the core is plastic and shrinkage cracks map the slab. Hollywood averages 0 such days in July — rarely the binding constraint here.
How long before you can drive on new concrete?
A week before tires, 24–48 hours before feet — at March-typical Hollywood temperatures (79°F highs). When nights slide toward 59°F, add days: cure speed is temperature. Early loads print permanent marks; the bag's cure table wins every argument.
Best season for concrete work in Hollywood?
Year-round — the months with 40°F+ nights, sub-90°F days, and manageable rain. March leads at 25 workable days; January bottoms out near 24.
Related
Other projects in Hollywood
- Deck Staining in Hollywood
- Exterior Painting in Hollywood
- Driveway Sealing in Hollywood
- Roof Coating in Hollywood
- Lawn Seeding in Hollywood
- All outdoor project weather in Hollywood
Concrete Pouring nearby
- Miami Gardens, FL
- Fort Lauderdale, FL
- Davie, FL
- Plantation, FL
- Pembroke Pines, FL
- Miramar, FL
- Sunrise, FL
- Hialeah, FL
Guides
Climatology: NOAA 1991–2020 normals via HOLLYWOOD, FL US (3.4 km from Hollywood center, elevation 9 ft); live outlook by Open-Meteo.