Concrete Pouring Weather in Sunrise, FL: 10-Day Windows & Best Months
Sunrise gives you roughly 196 workable concrete pouring days a year, concentrated September through June. The single best month is March, averaging 23 days that clear every check — highs of 79°F, lows near 62°F, and a 26% daily rain chance. Below: the live 10-day check and Sunrise's full month-by-month table.
GOOD — a clean label day MARGINAL — one borderline check NO — hard fail or stacked flags
The rules this check uses
Typical bagged-mix requirements for small DIY pours, scored against Sunrise's forecast above. The 48-hour freeze rule dominates every other row; structural work follows engineer/ACI specs instead of this table.
| Check | Threshold | Why it matters |
|---|---|---|
| Air temperature | 40–90°F — ideal 50–85°F | DIY pours work from 40–90°F; 50–85°F is the sweet spot. |
| Overnight low | ≥40°F during the first 48 h | A low under 40°F inside the first 48 hours puts you in cold-weather concreting — not a DIY window. |
| Dry before | no soaking (≥1.0") in the prior 24 h | What fell before you start matters as much as what falls after — surfaces hold water invisibly. |
| Dry after | <0.1" rain for 6 h after (12 h light rain after finishing still risks surface marks) | The make-or-break window: rain here undoes the work, not just delays it. |
| Wind | ≤20 mph (rapid surface drying up to 28 mph) | Scored on the windiest working hour; the marginal band changes the method, not the day. |
Always follow your product label — formulas vary. Treat the table as the consensus range across brands — the label in your hand is the final word.
Best months for concrete pouring in Sunrise
| Month | Avg high | Avg low | Rain odds/day | Workable days | |
|---|---|---|---|---|---|
| January | 76°F | 58°F | 28% | 22 | |
| February | 77°F | 60°F | 24% | 22 | |
| March | 79°F | 62°F | 26% | 23 | |
| April | 83°F | 67°F | 27% | 22 | |
| May | 86°F | 71°F | 37% | 19 | |
| June | 89°F | 75°F | 55% | 14 | |
| July | 90°F | 76°F | 56% | 4 | |
| August | 90°F | 76°F | 60% | 1 | |
| September | 89°F | 75°F | 60% | 12 | |
| October | 86°F | 72°F | 47% | 16 | |
| November | 81°F | 66°F | 36% | 19 | |
| December | 77°F | 61°F | 32% | 21 |
Figure 196 workable days a year in Sunrise, spread across September through June. Shoulder months turn on the overnight rule: an afternoon at 89°F passes, but the 40°F night floor is what actually opens the season in September. Neighboring towns shift by a month or more — the Florida comparison shows where Sunrise sits.
July here fails on heat, not rain: the average high of 90°F sits over the 90°F label ceiling, and 21 of 31 days typically top 90°F. Midsummer work moves to dawn or waits for March.
The rain odds swing hard across the year — 24% of days in February up to 60% in September. Season the plan accordingly: prep in the wet months, apply in the dry ones.
Sealing the same driveway later? Sealcoating in Sunrise wants warmer nights (50°F+) than the pour did.
Climatology here is measured at Ft Lauderdale, Fl Us (11.5 km away). Treat the monthly numbers as the neighborhood average; a shaded north-side deck runs colder and damper than any of them. The exact formula lives in the methodology.
Sunrise by the numbers
- Peak heat lands in August: 90°F average highs and 29 ninety-degree days.
- January bottoms the Sunrise year: 76°F days, 58°F nights.
- Rain-day odds swing from 24% in February to 60% in September.
- Annual workable concrete pouring days: about 196 of 365.
Prep checklist
- Clear the 48-hour rule first: two nights over 40°F. September opens that door in Sunrise; January (58°F average lows) slams it.
- Stage everything before mixing: forms braced, base compacted and damp, tools rinsed, help booked.
- Cut plastic sheeting and weight it at the pour's edge — Sunrise sees rain on 26% of March days, and the 6-hour rule doesn't negotiate.
- Resist the watery mix: it finishes easier today and dusts forever after. Low slump wins.
- Work the sequence: screed on the sheen, float as it dulls, and leave bleed water alone.
- Edge and joint with an edger + float set — control joints every 2–3 slab-thicknesses in feet.
- Hold the moisture in (sheeting or misting); when June nights dip toward 75°F, a curing blanket is the difference.
- Traffic schedule: feet at 24–48 hours, tires near day 7. Anything structural runs on engineer/ACI specs, not this checklist.
Gear that saves a window
Heads up: product links on this page may become affiliate links when the program is enabled. See the affiliate disclosure.
-
IR surface thermometer
Track slab temperature, not just the forecast.
-
Edger + float set
Rounded edges and a flat surface before it sets.
-
Concrete mix
An 80-lb bag yields about 0.6 cu ft — do the math twice.
-
Plastic sheeting
Emergency rain cover and moisture-holding cure layer.
-
Curing blanket
Holds heat through cold nights in the critical 48 hours.
FAQ
What temperature is too cold to pour concrete?
The line is a 40°F low inside the first 48 hours; an actual freeze (32°F) physically damages young concrete. Sunrise's January nights average 58°F — firmly out — while March nights hold near 62°F. Small pours only; structural work follows engineer/ACI specs.
Can you pour concrete before rain?
The engine wants 6 protected hours; light rain later actually feeds the cure. With 60% rain-day odds in September versus 24% in February, Sunrise's dry-season pours barely think about this rule and wet-season pours live by the radar. For small DIY pours; structural schedules follow ACI.
How long does concrete need to be protected from freezing?
Keep it above freezing for at least the first 48 hours (the engine calls any sub-40°F low in that window a NO). In Sunrise that rules out roughly January-adjacent months entirely and makes shoulder-season pours a two-night forecast decision. DIY scope; anything structural follows engineer/ACI cold-weather practice.
Is it OK to pour concrete in hot weather?
To a 90°F high, yes — with shade, cool mix water, a damp subgrade, and a dawn start. Above 90°F the surface sets while the core is plastic and shrinkage cracks map the slab. Sunrise averages 21 such days in July, which is why summer pours here move to first light.
How long before you can drive on new concrete?
A week before tires, 24–48 hours before feet — at March-typical Sunrise temperatures (79°F highs). When nights slide toward 58°F, add days: cure speed is temperature. Early loads print permanent marks; the bag's cure table wins every argument.
Best season for concrete work in Sunrise?
September through june — the months with 40°F+ nights, sub-90°F days, and manageable rain. March leads at 23 workable days; January bottoms out near 22.
Related
Other projects in Sunrise
- Deck Staining in Sunrise
- Exterior Painting in Sunrise
- Driveway Sealing in Sunrise
- Roof Coating in Sunrise
- Lawn Seeding in Sunrise
- All outdoor project weather in Sunrise
Concrete Pouring nearby
- Plantation, FL
- Davie, FL
- Coral Springs, FL
- Fort Lauderdale, FL
- Pembroke Pines, FL
- Hollywood, FL
- Pompano Beach, FL
- Miramar, FL
Guides
Climatology: NOAA 1991–2020 normals via FT LAUDERDALE, FL US (11.5 km from Sunrise center, elevation 16 ft); live outlook by Open-Meteo.