Concrete Pouring Weather in Sunrise, FL: 10-Day Windows & Best Months

Sunrise gives you roughly 196 workable concrete pouring days a year, concentrated September through June. The single best month is March, averaging 23 days that clear every check — highs of 79°F, lows near 62°F, and a 26% daily rain chance. Below: the live 10-day check and Sunrise's full month-by-month table.

Best month: January · 22 workable days

The next 10 days in Sunrise

GOOD — a clean label day MARGINAL — one borderline check NO — hard fail or stacked flags

The rules this check uses

Typical bagged-mix requirements for small DIY pours, scored against Sunrise's forecast above. The 48-hour freeze rule dominates every other row; structural work follows engineer/ACI specs instead of this table.

Typical label thresholds for concrete pouring — the ruleset behind every Sunrise verdict above.
CheckThresholdWhy it matters
Air temperature 40–90°F — ideal 50–85°F DIY pours work from 40–90°F; 50–85°F is the sweet spot.
Overnight low ≥40°F during the first 48 h A low under 40°F inside the first 48 hours puts you in cold-weather concreting — not a DIY window.
Dry before no soaking (≥1.0") in the prior 24 h What fell before you start matters as much as what falls after — surfaces hold water invisibly.
Dry after <0.1" rain for 6 h after (12 h light rain after finishing still risks surface marks) The make-or-break window: rain here undoes the work, not just delays it.
Wind ≤20 mph (rapid surface drying up to 28 mph) Scored on the windiest working hour; the marginal band changes the method, not the day.

Always follow your product label — formulas vary. Treat the table as the consensus range across brands — the label in your hand is the final word.

Best months for concrete pouring in Sunrise

January: 22 workable days · high 76°F / low 58°F · rain 28% of daysFebruary: 22 workable days · high 77°F / low 60°F · rain 24% of daysMarch: 23 workable days · high 79°F / low 62°F · rain 26% of daysApril: 22 workable days · high 83°F / low 67°F · rain 27% of daysMay: 19 workable days · high 86°F / low 71°F · rain 37% of daysJune: 14 workable days · high 89°F / low 75°F · rain 55% of daysJuly: 4 workable days · high 90°F / low 76°F · rain 56% of daysAugust: 1 workable days · high 90°F / low 76°F · rain 60% of daysSeptember: 12 workable days · high 89°F / low 75°F · rain 60% of daysOctober: 16 workable days · high 86°F / low 72°F · rain 47% of daysNovember: 19 workable days · high 81°F / low 66°F · rain 36% of daysDecember: 21 workable days · high 77°F / low 61°F · rain 32% of daysJanuary avg high 76°FJanuary avg low 58°FFebruary avg high 77°FFebruary avg low 60°FMarch avg high 79°FMarch avg low 62°FApril avg high 83°FApril avg low 67°FMay avg high 86°FMay avg low 71°FJune avg high 89°FJune avg low 75°FJuly avg high 90°FJuly avg low 76°FAugust avg high 90°FAugust avg low 76°FSeptember avg high 89°FSeptember avg low 75°FOctober avg high 86°FOctober avg low 72°FNovember avg high 81°FNovember avg low 66°FDecember avg high 77°FDecember avg low 61°FJanuary: rain on 28% of daysJFebruary: rain on 24% of daysFMarch: rain on 26% of daysMApril: rain on 27% of daysAMay: rain on 37% of daysMJune: rain on 55% of daysJJuly: rain on 56% of daysJAugust: rain on 60% of daysASeptember: rain on 60% of daysSOctober: rain on 47% of daysONovember: rain on 36% of daysNDecember: rain on 32% of daysD58°74°90°2222232219144112161921
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
How Sunrise months rank: temperature-rule days minus NOAA rain odds, from 1991–2020 normals. An estimate for planning, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 76°F 58°F 28% 22
February 77°F 60°F 24% 22
March 79°F 62°F 26% 23
April 83°F 67°F 27% 22
May 86°F 71°F 37% 19
June 89°F 75°F 55% 14
July 90°F 76°F 56% 4
August 90°F 76°F 60% 1
September 89°F 75°F 60% 12
October 86°F 72°F 47% 16
November 81°F 66°F 36% 19
December 77°F 61°F 32% 21

Figure 196 workable days a year in Sunrise, spread across September through June. Shoulder months turn on the overnight rule: an afternoon at 89°F passes, but the 40°F night floor is what actually opens the season in September. Neighboring towns shift by a month or more — the Florida comparison shows where Sunrise sits.

July here fails on heat, not rain: the average high of 90°F sits over the 90°F label ceiling, and 21 of 31 days typically top 90°F. Midsummer work moves to dawn or waits for March.

The rain odds swing hard across the year — 24% of days in February up to 60% in September. Season the plan accordingly: prep in the wet months, apply in the dry ones.

Sealing the same driveway later? Sealcoating in Sunrise wants warmer nights (50°F+) than the pour did.

Climatology here is measured at Ft Lauderdale, Fl Us (11.5 km away). Treat the monthly numbers as the neighborhood average; a shaded north-side deck runs colder and damper than any of them. The exact formula lives in the methodology.

For contrast, St. Petersburg, FL’s concrete pouring calendar sits one stop back on this route, and concrete pouring in Tallahassee, FL is next in line.

Sunrise by the numbers

Prep checklist

  1. Clear the 48-hour rule first: two nights over 40°F. September opens that door in Sunrise; January (58°F average lows) slams it.
  2. Stage everything before mixing: forms braced, base compacted and damp, tools rinsed, help booked.
  3. Cut plastic sheeting and weight it at the pour's edge — Sunrise sees rain on 26% of March days, and the 6-hour rule doesn't negotiate.
  4. Resist the watery mix: it finishes easier today and dusts forever after. Low slump wins.
  5. Work the sequence: screed on the sheen, float as it dulls, and leave bleed water alone.
  6. Edge and joint with an edger + float set — control joints every 2–3 slab-thicknesses in feet.
  7. Hold the moisture in (sheeting or misting); when June nights dip toward 75°F, a curing blanket is the difference.
  8. Traffic schedule: feet at 24–48 hours, tires near day 7. Anything structural runs on engineer/ACI specs, not this checklist.

Pro moves for Sunrise conditions

Gear that saves a window

Heads up: product links on this page may become affiliate links when the program is enabled. See the affiliate disclosure.

Frequently asked questions

What temperature is too cold to pour concrete?

The line is a 40°F low inside the first 48 hours; an actual freeze (32°F) physically damages young concrete. Sunrise's January nights average 58°F — firmly out — while March nights hold near 62°F. Small pours only; structural work follows engineer/ACI specs.

Can you pour concrete before rain?

The engine wants 6 protected hours; light rain later actually feeds the cure. With 60% rain-day odds in September versus 24% in February, Sunrise's dry-season pours barely think about this rule and wet-season pours live by the radar. For small DIY pours; structural schedules follow ACI.

How long does concrete need to be protected from freezing?

Keep it above freezing for at least the first 48 hours (the engine calls any sub-40°F low in that window a NO). In Sunrise that rules out roughly January-adjacent months entirely and makes shoulder-season pours a two-night forecast decision. DIY scope; anything structural follows engineer/ACI cold-weather practice.

Is it OK to pour concrete in hot weather?

To a 90°F high, yes — with shade, cool mix water, a damp subgrade, and a dawn start. Above 90°F the surface sets while the core is plastic and shrinkage cracks map the slab. Sunrise averages 21 such days in July, which is why summer pours here move to first light.

How long before you can drive on new concrete?

A week before tires, 24–48 hours before feet — at March-typical Sunrise temperatures (79°F highs). When nights slide toward 58°F, add days: cure speed is temperature. Early loads print permanent marks; the bag's cure table wins every argument.

Best season for concrete work in Sunrise?

September through june — the months with 40°F+ nights, sub-90°F days, and manageable rain. March leads at 23 workable days; January bottoms out near 22.

How windy is too windy to pour concrete?

Wind matters as much as temperature. Breezes above about 10 to 15 mph, especially with low humidity or warm sun, can evaporate surface moisture faster than bleed water rises — ACI guidance flags evaporation rates above 0.2 pounds per square foot per hour as plastic-shrinkage-cracking territory. For a small DIY slab, wait for a calm morning or rig windbreaks and fog-mist the air above the surface.

How long should I keep new concrete wet?

Keep it continuously wet for at least 7 days — the moist-curing period ACI guidance specifies for conventional concrete (3 days for high-early mixes). Use soaker hoses, wet burlap, curing blankets, or sheet plastic, or spray on a curing compound after finishing. Concrete allowed to dry out early can lose a large share of its potential strength and is far more likely to dust, scale, and crack.

When can I remove the forms from a small concrete pour?

For slabs, walkways, and post footings, side forms can usually come off 24 to 48 hours after the pour — leave them at least 72 hours when temperatures run below 50°F, since strength gain slows dramatically. Pry against the ground, never the green concrete, and keep curing the exposed edges afterward. Forms supporting structural or suspended concrete follow engineering rules, not DIY timelines.

How soon can I seal new concrete?

Wait until it reaches full cure — about 28 days — before applying most penetrating or acrylic sealers; sealing earlier traps moisture and can cause clouding or poor bond. The exception is a cure-and-seal product designed to go on the day of the pour. Pick a dry stretch with temperatures roughly 50 to 90°F — in Sunrise, January typically offers the most reliable window — so the sealer itself cures properly.

Concrete Pouring glossary

Evaporation rate
How fast surface moisture leaves fresh concrete, driven by temperature, wind, and humidity; rates above about 0.2 lb per square foot per hour invite plastic shrinkage cracking.
Plastic shrinkage cracking
Shallow, random cracks forming within hours of placement when the surface dries faster than bleed water can replace it; wind and sun are the usual culprits.
Bleed water
Mix water that rises to the surface after placement; finishing before it evaporates traps it under the trowel, creating a weak, dusty top layer.
Hydration
The chemical reaction between cement and water that hardens concrete; it needs moisture and temperatures above roughly 40°F, and continues gaining strength for weeks.
Curing compound
A sprayed or rolled membrane that seals moisture inside fresh concrete when wet curing isn't practical; some types must be stripped before paint or sealer.
Air entrainment
Microscopic air bubbles added to the mix that give exterior concrete freeze-thaw and deicer resistance; it must be ordered in the mix, not added later.