Concrete Pouring Weather in Hattiesburg, MS: 10-Day Windows & Best Months

In Hattiesburg, the label math works from February through June: that's the stretch with 8+ workable days a month against typical concrete pouring rules. The single best month is October, averaging 24 days that clear every check — highs of 79°F, lows near 56°F, and a 22% daily rain chance. The strip above runs Hattiesburg's live forecast; the table below ranks all 12 months.

Best month: May · 22 workable days

The next 10 days in Hattiesburg

GOOD — clears every rule MARGINAL — exactly one soft miss NO — a hard fail, or two soft

The rules this check uses

Every verdict above applies this table to Hattiesburg's hours. DIY scope only: the freeze row outranks everything, and structural work belongs to engineer/ACI specifications.

Typical label thresholds for concrete pouring — the ruleset behind every Hattiesburg verdict above.
CheckThresholdWhy it matters
Air temperature 40–90°F — ideal 50–85°F Checked across the working day, 8 a.m.–6 p.m., against Hattiesburg's hourly forecast — not just the daily high.
Overnight low ≥40°F during the first 48 h The engine reads every overnight hour in the cure window, not just Hattiesburg's forecast low.
Dry before no soaking (≥1.0") in the prior 24 h Rain before the pour only matters if the ground is soaked or standing in water.
Dry after <0.1" rain for 6 h after (12 h light rain after finishing still risks surface marks) A downpour in the first 6 hours can wash the surface; after final set, rain actually helps curing.
Wind ≤20 mph (rapid surface drying up to 28 mph) Wind wrecks application first (drift, lap marks) and carries debris into wet work second.

Always follow your product label — formulas vary. These rows are the industry-typical range; the can in your Hattiesburg garage is the contract.

Best months for concrete pouring in Hattiesburg

January: 0 workable days · high 60°F / low 38°F · rain 36% of daysFebruary: 13 workable days · high 64°F / low 41°F · rain 36% of daysMarch: 21 workable days · high 71°F / low 48°F · rain 31% of daysApril: 22 workable days · high 78°F / low 54°F · rain 27% of daysMay: 22 workable days · high 84°F / low 62°F · rain 28% of daysJune: 10 workable days · high 90°F / low 70°F · rain 38% of daysJuly: 0 workable days · high 91°F / low 72°F · rain 42% of daysAugust: 0 workable days · high 91°F / low 72°F · rain 36% of daysSeptember: 19 workable days · high 88°F / low 67°F · rain 28% of daysOctober: 24 workable days · high 79°F / low 56°F · rain 22% of daysNovember: 22 workable days · high 69°F / low 46°F · rain 25% of daysDecember: 12 workable days · high 62°F / low 40°F · rain 33% of daysJanuary avg high 60°FJanuary avg low 38°FFebruary avg high 64°FFebruary avg low 41°FMarch avg high 71°FMarch avg low 48°FApril avg high 78°FApril avg low 54°FMay avg high 84°FMay avg low 62°FJune avg high 90°FJune avg low 70°FJuly avg high 91°FJuly avg low 72°FAugust avg high 91°FAugust avg low 72°FSeptember avg high 88°FSeptember avg low 67°FOctober avg high 79°FOctober avg low 56°FNovember avg high 69°FNovember avg low 46°FDecember avg high 62°FDecember avg low 40°FJanuary: rain on 36% of daysJFebruary: rain on 36% of daysFMarch: rain on 31% of daysMApril: rain on 27% of daysAMay: rain on 28% of daysMJune: rain on 38% of daysJJuly: rain on 42% of daysJAugust: rain on 36% of daysASeptember: rain on 28% of daysSOctober: rain on 22% of daysONovember: rain on 25% of daysNDecember: rain on 33% of daysD38°64°91°013212222100019242212
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
Workable days in Hattiesburg, MS: days meeting the temperature rules, discounted by NOAA rain odds — a 1991–2020 estimate, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 60°F 38°F 36% 0
February 64°F 41°F 36% 13
March 71°F 48°F 31% 21
April 78°F 54°F 27% 22
May 84°F 62°F 28% 22
June 90°F 70°F 38% 10
July 91°F 72°F 42% 0
August 91°F 72°F 36% 0
September 88°F 67°F 28% 19
October 79°F 56°F 22% 24
November 69°F 46°F 25% 22
December 62°F 40°F 33% 12

Figure 166 workable days a year in Hattiesburg, spread across February through June. Shoulder months turn on the overnight rule: an afternoon at 64°F passes, but the 40°F night floor is what actually opens the season in February. For the statewide picture, the Mississippi page compares peak months city by city.

July here fails on heat, not rain: the average high of 91°F sits over the 90°F label ceiling, and 31 of 31 days typically top 90°F. Midsummer work moves to dawn or waits for October.

The rain odds swing hard across the year — 22% of days in October up to 42% in July. Season the plan accordingly: prep in the wet months, apply in the dry ones.

Sealing the same driveway later? Sealcoating in Hattiesburg wants warmer nights (50°F+) than the pour did.

Numbers above come from NOAA's 1991–2020 normals for Hattiesburg 5Sw, Ms Us, 6.2 km from the city center — close enough that neighborhood microclimates (shade lines, river valleys, urban heat) matter more than station distance. See how these day counts are scored.

For contrast, Gulfport, MS’s concrete pouring calendar sits one stop back on this route, and concrete pouring in Jackson, MS is next in line.

Hattiesburg by the numbers

Prep checklist

  1. Clear the 48-hour rule first: two nights over 40°F. February opens that door in Hattiesburg; January (38°F average lows) slams it.
  2. Set the stage first: forms braced, subgrade compacted and lightly damp, every tool within reach, help confirmed.
  3. Cut plastic sheeting and weight it at the pour's edge — Hattiesburg sees rain on 22% of October days, and the 6-hour rule doesn't negotiate.
  4. Keep the mix stiff (oatmeal, not soup) — every extra quart of water is permanent surface strength lost.
  5. Screed while it sheens, float when the sheen dulls, and never trowel bleed water back in.
  6. Edge and joint with an edger + float set — control joints every 2–3 slab-thicknesses in feet.
  7. Hold the moisture in (sheeting or misting); when June nights dip toward 70°F, a curing blanket is the difference.
  8. Feet after 24–48 h, cars after about a week — and structural work follows engineer/ACI specs, not this list.

Pro moves for Hattiesburg conditions

Gear that saves a window

FTC note: the gear below is unlinked until the affiliate program is switched on. See the affiliate disclosure.

Frequently asked questions

What temperature is too cold to pour concrete?

The line is a 40°F low inside the first 48 hours; an actual freeze (32°F) physically damages young concrete. Hattiesburg's January nights average 38°F — firmly out — while October nights hold near 56°F. Small pours only; structural work follows engineer/ACI specs.

Can you pour concrete before rain?

The engine wants 6 protected hours; light rain later actually feeds the cure. With 42% rain-day odds in July versus 22% in October, Hattiesburg's dry-season pours barely think about this rule and wet-season pours live by the radar. For small DIY pours; structural schedules follow ACI.

How long does concrete need to be protected from freezing?

Keep it above freezing for at least the first 48 hours (the engine calls any sub-40°F low in that window a NO). In Hattiesburg that rules out roughly January-adjacent months entirely and makes shoulder-season pours a two-night forecast decision. DIY scope; anything structural follows engineer/ACI cold-weather practice.

Is it OK to pour concrete in hot weather?

To a 90°F high, yes — with shade, cool mix water, a damp subgrade, and a dawn start. Above 90°F the surface sets while the core is plastic and shrinkage cracks map the slab. Hattiesburg averages 31 such days in July, which is why summer pours here move to first light.

How long before you can drive on new concrete?

A week before tires, 24–48 hours before feet — at October-typical Hattiesburg temperatures (79°F highs). When nights slide toward 38°F, add days: cure speed is temperature. Early loads print permanent marks; the bag's cure table wins every argument.

Best season for concrete work in Hattiesburg?

The table above says October, November and May: enough warmth for the 48-hour cure, short of the 90°F ceiling. For small DIY pours that's the whole answer; structural pours schedule to engineer/ACI requirements, not to a best-months chart.

How windy is too windy to pour concrete?

Wind matters as much as temperature. Breezes above about 10 to 15 mph, especially with low humidity or warm sun, can evaporate surface moisture faster than bleed water rises — ACI guidance flags evaporation rates above 0.2 pounds per square foot per hour as plastic-shrinkage-cracking territory. For a small DIY slab, wait for a calm morning or rig windbreaks and fog-mist the air above the surface.

How long should I keep new concrete wet?

Keep it continuously wet for at least 7 days — the moist-curing period ACI guidance specifies for conventional concrete (3 days for high-early mixes). Use soaker hoses, wet burlap, curing blankets, or sheet plastic, or spray on a curing compound after finishing. Concrete allowed to dry out early can lose a large share of its potential strength and is far more likely to dust, scale, and crack.

When can I remove the forms from a small concrete pour?

For slabs, walkways, and post footings, side forms can usually come off 24 to 48 hours after the pour — leave them at least 72 hours when temperatures run below 50°F, since strength gain slows dramatically. Pry against the ground, never the green concrete, and keep curing the exposed edges afterward. Forms supporting structural or suspended concrete follow engineering rules, not DIY timelines.

How soon can I seal new concrete?

Wait until it reaches full cure — about 28 days — before applying most penetrating or acrylic sealers; sealing earlier traps moisture and can cause clouding or poor bond. The exception is a cure-and-seal product designed to go on the day of the pour. Pick a dry stretch with temperatures roughly 50 to 90°F — in Hattiesburg, May typically offers the most reliable window — so the sealer itself cures properly.

Concrete Pouring glossary

Evaporation rate
How fast surface moisture leaves fresh concrete, driven by temperature, wind, and humidity; rates above about 0.2 lb per square foot per hour invite plastic shrinkage cracking.
Plastic shrinkage cracking
Shallow, random cracks forming within hours of placement when the surface dries faster than bleed water can replace it; wind and sun are the usual culprits.
Bleed water
Mix water that rises to the surface after placement; finishing before it evaporates traps it under the trowel, creating a weak, dusty top layer.
Hydration
The chemical reaction between cement and water that hardens concrete; it needs moisture and temperatures above roughly 40°F, and continues gaining strength for weeks.
Curing compound
A sprayed or rolled membrane that seals moisture inside fresh concrete when wet curing isn't practical; some types must be stripped before paint or sealer.
Air entrainment
Microscopic air bubbles added to the mix that give exterior concrete freeze-thaw and deicer resistance; it must be ordered in the mix, not added later.

People also search for

Other projects in Hattiesburg

Concrete Pouring nearby

Guides

Climatology: NOAA 1991–2020 normals via HATTIESBURG 5SW, MS US (6.2 km from Hattiesburg center, elevation 385 ft); live outlook by Open-Meteo.