Driveway Sealing Weather in Beaverton, OR: 10-Day Windows & Best Months

In Beaverton, the label math works from June through September: that's the stretch with 8+ workable days a month against typical driveway sealing rules. August leads the calendar with 27 workable days: average high 82°F, low 57°F, rain on 13% of days. The strip above runs Beaverton's live forecast; the table below ranks all 12 months.

Best month: June · 20 workable days

The next 10 days in Beaverton

GOOD — clears every rule MARGINAL — exactly one soft miss NO — a hard fail, or two soft

The rules this check uses

This table is the whole Beaverton check: pail-consensus thresholds, the rising-trend requirement, and a 36-hour cure standing in for the labels' 24–48 spread.

Typical label thresholds for driveway sealing — the ruleset behind every Beaverton verdict above.
CheckThresholdWhy it matters
Air temperature 55–90°F, and rising Checked across the working day, 8 a.m.–6 p.m., against Beaverton's hourly forecast — not just the daily high.
Overnight low ≥50°F during the first 24 h The engine reads every overnight hour in the cure window, not just Beaverton's forecast low.
Dry before ≤0.05" rain in the prior 24 h Asphalt must be fully dry; sealer will not bond to damp pavement.
Dry after <0.05" rain for 36 h after (48 h cool or shaded driveways want 48 h) Most sealers list 24–48 dry hours; this site checks 36.
Evening dew-point spread ≥5°F from 6–11 pm Scored on the worst hour between 6 and 11 p.m., when surfaces cool past the air.
Daytime humidity ≤85% Water-based sealer dries by evaporation; humid air stalls it.
Wind ≤20 mph (dust and debris in wet sealer up to 28 mph) Wind wrecks application first (drift, lap marks) and carries debris into wet work second.

Always follow your product label — formulas vary. These rows are the industry-typical range; the can in your Beaverton garage is the contract.

Best months for driveway sealing in Beaverton

January: 0 workable days · high 50°F / low 40°F · rain 64% of daysFebruary: 0 workable days · high 54°F / low 40°F · rain 62% of daysMarch: 0 workable days · high 58°F / low 42°F · rain 63% of daysApril: 0 workable days · high 63°F / low 45°F · rain 56% of daysMay: 8 workable days · high 70°F / low 50°F · rain 44% of daysJune: 20 workable days · high 73°F / low 53°F · rain 33% of daysJuly: 27 workable days · high 81°F / low 56°F · rain 14% of daysAugust: 27 workable days · high 82°F / low 57°F · rain 13% of daysSeptember: 19 workable days · high 76°F / low 52°F · rain 32% of daysOctober: 0 workable days · high 65°F / low 47°F · rain 53% of daysNovember: 0 workable days · high 55°F / low 43°F · rain 63% of daysDecember: 0 workable days · high 49°F / low 40°F · rain 61% of daysJanuary avg high 50°FJanuary avg low 40°FFebruary avg high 54°FFebruary avg low 40°FMarch avg high 58°FMarch avg low 42°FApril avg high 63°FApril avg low 45°FMay avg high 70°FMay avg low 50°FJune avg high 73°FJune avg low 53°FJuly avg high 81°FJuly avg low 56°FAugust avg high 82°FAugust avg low 57°FSeptember avg high 76°FSeptember avg low 52°FOctober avg high 65°FOctober avg low 47°FNovember avg high 55°FNovember avg low 43°FDecember avg high 49°FDecember avg low 40°FJanuary: rain on 64% of daysJFebruary: rain on 62% of daysFMarch: rain on 63% of daysMApril: rain on 56% of daysAMay: rain on 44% of daysMJune: rain on 33% of daysJJuly: rain on 14% of daysJAugust: rain on 13% of daysASeptember: rain on 32% of daysSOctober: rain on 53% of daysONovember: rain on 63% of daysNDecember: rain on 61% of daysD40°61°82°0000820272719000
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
Workable days in Beaverton, OR: days meeting the temperature rules, discounted by NOAA rain odds — a 1991–2020 estimate, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 50°F 40°F 64% 0
February 54°F 40°F 62% 0
March 58°F 42°F 63% 0
April 63°F 45°F 56% 0
May 70°F 50°F 44% 8
June 73°F 53°F 33% 20
July 81°F 56°F 14% 27
August 82°F 57°F 13% 27
September 76°F 52°F 32% 19
October 65°F 47°F 53% 0
November 55°F 43°F 63% 0
December 49°F 40°F 61% 0

The working season runs June through September — about 101 workable days a year. The edges are night-limited: label rules want overnight lows of 50°F+, and Beaverton's nights only average that from June to September. For the statewide picture, the Oregon page compares peak months city by city.

Beaverton has a real wet/dry rhythm: January brings rain on 64% of days versus 13% in August. When the calendar gives you a August-side window, the dry-before and dry-after rules nearly take care of themselves.

The other driveway job reads differently: pouring concrete in Beaverton cares about two safe nights, not rising afternoons.

Numbers above come from NOAA's 1991–2020 normals for Nature Park-Beaverton, Or Us, 2.9 km from the city center — close enough that neighborhood microclimates (shade lines, river valleys, urban heat) matter more than station distance. See how these day counts are scored.

Comparing calendars along the loop? See how the season shifts for driveway sealing in Tulsa, OK, or jump ahead to driveway sealing in Bend, OR.

Beaverton by the numbers

Prep checklist

  1. The strip above is hunting one shape: 55°F rising, a 50°F+ night, 36 dry hours. Beaverton produces it 27 days in a typical August.
  2. Run crack filler the previous afternoon — filler needs its own skin time before topcoating.
  3. Sweep to bare asphalt and kill the oil spots first — emulsion won't bond through either.
  4. Confirm the lookback: under 0.05" of rain in the prior 24 h — after a January shower (64% of days), cracks hold water longest.
  5. Tape the garage slab and sidewalk lines with edging tape — drips on concrete are forever.
  6. Pull thin passes with a squeegee/brush combo, back-brushing the texture as you go.
  7. Morning start at the garage end, working toward the street — Beaverton's August gives the coat 82°F daylight before the evening spread tightens.
  8. Keep tires off through the full cure — with August nights at 57°F, shaded strips need the long end of 24–48 h.

Pro moves for Beaverton conditions

Gear that saves a window

FTC note: the gear below is unlinked until the affiliate program is switched on. See the affiliate disclosure.

Frequently asked questions

What temperature do you need to seal a driveway?

The pail wants 55°F+ air, a 50°F+ first night, and temperatures trending up through the cure. Beaverton clears all three reliably from June through September; outside that, December's 40°F average nights end the argument.

How long after rain can I sealcoat?

Give it a full dry day: the engine fails any start within 24 hours of measurable rain. Filled cracks dry last. Beaverton's rain-day odds run 13–64% across the year, so the same rule costs different months very differently.

How long does driveway sealer take to dry before rain or cars?

Labels say 24–48 hours; this site checks 36 as the honest middle. Foot traffic sooner, tires last. Beaverton's cure risk is mostly rain timing — in January, odds of a wet day inside a 36-hour window run high enough that the strip above is the only sane scheduler.

Can you seal a driveway in the fall?

In Beaverton, early fall works while nights hold: the season's last reliable month is September (average low 52°F against the 50°F first-night rule). After that, warm afternoons sit on cold slabs and the cure stalls.

How often should a driveway be sealed?

Every 2–4 years, or when water stops beading and the surface grays. More often builds a peeling film; less often lets water work the cracks through Beaverton's 27 sub-40°F December nights. New asphalt cures 6–12 months before its first coat — and crack filler goes in a day ahead.

Best month to seal a driveway in OR?

August tops Beaverton's table at 27 days clearing the 55–90°F-rising, 50°F-night, 36-dry-hour stack; August and July together carry the season. Check the OR state page for how the ranking shifts across the state.

How many coats of driveway sealer do I need?

Two thin coats beat one heavy coat. Thin films cure evenly all the way through, while a single thick pass skins over, stays soft underneath, and tracks footprints. Wait until the first coat is dry to the touch — commonly 2 to 8 hours depending on product and sun — then apply the second at a right angle for uniform coverage.

Can I apply driveway sealer to a damp driveway?

Slightly damp is fine for water-based asphalt-emulsion sealers — pros often mist hot pavement first so the sealer doesn't flash-dry — but standing water is not. Puddles dilute the emulsion and leave thin, gray, fast-failing patches. After washing the driveway, let it dry until it is uniformly damp-dark with no shine, and never seal while rainwater still pools in low spots.

How long should a new asphalt driveway cure before sealing?

Fresh asphalt needs its lightweight oils to oxidize before sealer will bond. Installers and sealer manufacturers say wait at least 90 days, and 6 to 12 months is safer — many recommend letting new pavement go through a full summer first. Sealing too soon traps those oils, leaving the surface soft and prone to scuffing and tire marks. The color shift from jet black to matte gray signals readiness.

How often should you seal an asphalt driveway?

Every 2 to 3 years for most driveways — when the surface fades to gray and water stops beading. Annual sealing is counterproductive: coats build up, then crack and peel in sheets. Driveways in Beaverton exposed to harsh sun or freeze-thaw cycling sit at the shorter end of that range; shaded, mild-climate pavement can stretch a year or two longer.

Driveway Sealing glossary

Asphalt emulsion
A water-based blend of asphalt binder and emulsifiers used in most DIY sealers; it cures as water evaporates, so temperature, humidity, and sun control dry time.
Tack-free time
The point when sealer no longer sticks to a light touch — usually a few hours in sun — though full cure for vehicle traffic takes far longer.
Squeegee coat
A thin application worked into the pavement surface with a rubber squeegee; thin coats cure through completely, while thick coats skin over and stay soft underneath.
Oxidation
UV and oxygen slowly breaking down asphalt binder, turning pavement gray and brittle; sealer's main job is slowing this process, not fixing structural cracks.
Pavement surface temperature
Blacktop in summer sun can exceed 120°F even on an 85°F day; sealer flash-dries and streaks on overheated pavement, so pros mist it first.
Coverage rate
Square feet one gallon covers — typically 50 to 80 for asphalt emulsion, depending on pavement porosity; stretching sealer thinner than spec leaves a weak, fast-wearing film.