WorkWindow

Exterior Painting · Oregon

Exterior Painting Weather in Beaverton, OR: 10-Day Windows & Best Months

In Beaverton, the label math works from February through November: that's the stretch with 8+ workable days a month against typical exterior painting rules. August leads the calendar with 27 workable days: average high 82°F, low 57°F, rain on 13% of days. The strip above runs Beaverton's live forecast; the table below ranks all 12 months.

Best month: July · 27 workable days

The next 10 days in Beaverton

GOOD — clears every rule MARGINAL — exactly one soft miss NO — a hard fail, or two soft

The rules this check uses

Each verdict above is this table applied to Beaverton's forecast. Standard latex rules, with the 35°F-rated formulas handled as a marginal band, not a pass.

Typical label thresholds for exterior painting — the ruleset behind every Beaverton verdict above.
CheckThresholdWhy it matters
Air temperature 50–90°F (low-temp formulas from 35°F) Checked across the working day, 8 a.m.–6 p.m., against Beaverton's hourly forecast — not just the daily high.
Overnight low ≥35°F during the first 24 h (≥40°F preferred) The engine reads every overnight hour in the cure window, not just Beaverton's forecast low.
Dry before ≤0.05" rain in the prior 12 h; watch back to 24 h The surface must be dry to the touch and out of a recent soak.
Dry after <0.05" rain for 24 h after Rain inside the first 24 hours can streak or wash fresh paint.
Evening dew-point spread ≥5°F from 6–11 pm Scored on the worst hour between 6 and 11 p.m., when surfaces cool past the air.
Daytime humidity ≤80% High humidity extends recoat and cure times.
Wind ≤15 mph (brush only up to 20 mph) Wind wrecks application first (drift, lap marks) and carries debris into wet work second.

Always follow your product label — formulas vary. These rows are the industry-typical range; the can in your Beaverton garage is the contract.

Best months for exterior painting in Beaverton

January: 5 workable days · high 50°F / low 40°F · rain 64% of daysFebruary: 11 workable days · high 54°F / low 40°F · rain 62% of daysMarch: 12 workable days · high 58°F / low 42°F · rain 63% of daysApril: 13 workable days · high 63°F / low 45°F · rain 56% of daysMay: 17 workable days · high 70°F / low 50°F · rain 44% of daysJune: 20 workable days · high 73°F / low 53°F · rain 33% of daysJuly: 27 workable days · high 81°F / low 56°F · rain 14% of daysAugust: 27 workable days · high 82°F / low 57°F · rain 13% of daysSeptember: 21 workable days · high 76°F / low 52°F · rain 32% of daysOctober: 14 workable days · high 65°F / low 47°F · rain 53% of daysNovember: 11 workable days · high 55°F / low 43°F · rain 63% of daysDecember: 1 workable days · high 49°F / low 40°F · rain 61% of daysJanuary avg high 50°FJanuary avg low 40°FFebruary avg high 54°FFebruary avg low 40°FMarch avg high 58°FMarch avg low 42°FApril avg high 63°FApril avg low 45°FMay avg high 70°FMay avg low 50°FJune avg high 73°FJune avg low 53°FJuly avg high 81°FJuly avg low 56°FAugust avg high 82°FAugust avg low 57°FSeptember avg high 76°FSeptember avg low 52°FOctober avg high 65°FOctober avg low 47°FNovember avg high 55°FNovember avg low 43°FDecember avg high 49°FDecember avg low 40°FJanuary: rain on 64% of daysJFebruary: rain on 62% of daysFMarch: rain on 63% of daysMApril: rain on 56% of daysAMay: rain on 44% of daysMJune: rain on 33% of daysJJuly: rain on 14% of daysJAugust: rain on 13% of daysASeptember: rain on 32% of daysSOctober: rain on 53% of daysONovember: rain on 63% of daysNDecember: rain on 61% of daysD40°61°82°5111213172027272114111
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
Workable days in Beaverton, OR: days meeting the temperature rules, discounted by NOAA rain odds — a 1991–2020 estimate, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 50°F 40°F 64% 5
February 54°F 40°F 62% 11
March 58°F 42°F 63% 12
April 63°F 45°F 56% 13
May 70°F 50°F 44% 17
June 73°F 53°F 33% 20
July 81°F 56°F 14% 27
August 82°F 57°F 13% 27
September 76°F 52°F 32% 21
October 65°F 47°F 53% 14
November 55°F 43°F 63% 11
December 49°F 40°F 61% 1

The working season runs February through November — about 179 workable days a year. The edges are night-limited: label rules want overnight lows of 40°F+, and Beaverton's nights only average that from January to November. For the statewide picture, the Oregon page compares peak months city by city.

Beaverton has a real wet/dry rhythm: January brings rain on 64% of days versus 13% in August. When the calendar gives you a August-side window, the dry-before and dry-after rules nearly take care of themselves.

Related check: roof coating in Beaverton — same 50–90°F chemistry, but roofs hit the dew point first and wind is a safety stop.

Numbers above come from NOAA's 1991–2020 normals for Nature Park-Beaverton, Or Us, 2.9 km from the city center — close enough that neighborhood microclimates (shade lines, river valleys, urban heat) matter more than station distance. See how these day counts are scored.

Comparing calendars along the loop? See how the season shifts for exterior painting in Tulsa, OK, or jump ahead to exterior painting in Bend, OR.

Beaverton by the numbers

Prep checklist

  1. Two clean days beat one perfect one: 24 h of dry cure and a 40°F+ night — August is Beaverton's highest-odds month (27 days).
  2. Prep is the coat that matters — wash off chalk and mildew, scrape to sound edges.
  3. Give washed siding 24 hours — north walls in Beaverton can need double after a January-grade soak.
  4. Read the wall, not the app: an ir surface thermometer on sunlit siding shows 20°F+ over Beaverton's reported 82°F.
  5. Prime bare wood and stains; caulk once the surface is dry to the touch.
  6. Follow the shade around the house — never a wall in direct midday sun.
  7. Cut in with an angled brush set, roll a wet edge, and drop the sprayer plan over 15 mph.
  8. Stop 2 hours before sunset: with August lows near 57°F, Beaverton's siding meets the dew point before the late news.

Pro moves for Beaverton conditions

Gear that saves a window

FTC note: the gear below is unlinked until the affiliate program is switched on. See the affiliate disclosure.

Frequently asked questions

What temperature can you paint outside?

Standard latex: 50–90°F with nights of 40°F+; low-temperature formulas are rated down to 35°F and the engine marks 35–50°F highs as MARGINAL for exactly that reason. Beaverton's edge months live in that band — February averages 54°F highs over 40°F nights.

How many dry hours does exterior paint need before rain?

About 24 — a 0.05"+ shower inside that window streaks or washes fresh latex. Beaverton offers those 24-hour dry runs most reliably in August (rain on just 13% of days); January is the gamble at 64%.

Why does dew ruin fresh paint?

Because a film that hasn't coalesced can't shed water: on cooling Beaverton siding, dew flat-spots the sheen and drags surfactants out in streaks. It forms when the wall reaches the dew point — the engine wants a 5°F spread from 6–11 p.m. Finish 2 hours before sunset and latex gets its lead time.

Can you paint in high humidity?

The label limit is ~80% relative humidity, and it compounds: humid air slows the cure, which pushes wet film into dew hours. The engine flags 80–83% and fails beyond. In Beaverton, the drier August air makes this a non-issue; muggy spells make it the day-killer.

What is surface temperature vs air temperature?

The forecast reports air; the label limits the wall. In direct sun a wall runs 20°F+ hotter — a 81°F Beaverton July day can put a west wall past the 90°F ceiling by mid-afternoon. Follow the shade around the house and check the surface by hand or IR thermometer.

When does painting season end in Beaverton?

When nights stop clearing 40°F — in Beaverton that's typically after November, when average lows hit 43°F and falling. Low-temp formulas (35°F rated) buy a few extra weeks; the engine shows them as MARGINAL days before the hard close.

What humidity is too high for exterior painting?

Most acrylic paints apply well between 40 and 70 percent relative humidity. Above about 85 percent, water can't evaporate from the film, so drying stalls, sags develop, and surfactants rise as sticky brown streaks. Very low humidity under 20 percent causes the opposite problem — paint dries too fast to level. Check the hourly forecast for Beaverton and aim for a falling-humidity afternoon.

What is the dew point rule for exterior painting?

Coating manufacturers require the surface to be at least 5°F above the dew point during application and initial drying. Closer than that, an invisible film of condensation forms on the siding, which ruins adhesion and can flash-rust bare metal. Practically, start after morning dew has fully evaporated and stop early enough that paint is set before the evening temperature drop.

How windy is too windy to paint outside?

Sustained winds above about 15 mph make brushing and rolling risky: paint skins before it levels, lap marks multiply, and dust or pollen embeds in the wet film. Spraying is far more sensitive — overspray drifts onto cars and neighbors above roughly 5 to 10 mph. Wind also accelerates drying, shortening your wet edge, so pick calm mornings for large walls.

Why is my fresh exterior paint blistering?

Heat blisters form when paint is applied to siding baking in direct sun — the surface skins over, then trapped solvent or water vaporizes underneath. Moisture blisters appear when paint goes over damp wood or when interior moisture pushes outward. Paint shaded sides, keep surfaces under about 90°F, and let rain-soaked siding dry a day or two before coating.

Exterior Painting glossary

Dew point spread
The gap between air temperature and dew point; painting standards call for surfaces at least 5°F above the dew point to prevent invisible condensation under fresh paint.
Surfactant leaching
Sticky brown or glossy streaks that surface when latex paint dries in cool, damp conditions; usually cosmetic and rinses off after the paint fully cures.
Wet edge
Keeping the boundary of just-applied paint wet so the next stroke blends invisibly; heat, wind, and low humidity shorten it and cause lap marks.
Surface temperature
The actual temperature of siding, which can run 20 to 40°F above air temperature in direct sun; paint labels' limits apply to the surface, not the forecast.
Full cure
The point when paint reaches final hardness and washability — typically 2 to 4 weeks for exterior acrylics — distinct from dry-to-touch, which takes only hours.
Blocking
Fresh paint sticking to itself where surfaces touch, like doors against jambs; worst in heat and humidity before the film fully cures.

People also search for

Other projects in Beaverton

Exterior Painting nearby

Guides

Climatology: NOAA 1991–2020 normals via NATURE PARK-BEAVERTON, OR US (2.9 km from Beaverton center, elevation 185 ft); live outlook by Open-Meteo.