Exterior Painting Weather in Ogden, UT: 10-Day Windows & Best Months

The exterior painting season in Ogden runs August through October — 5 months averaging at least 8 workable days by NOAA 1991–2020 normals. The single best month is September, averaging 25 days that clear every check — highs of 80°F, lows near 53°F, and a 17% daily rain chance. Below: today through day 10 against the label rules, then the year at a glance.

Best month: May · 23 workable days

The next 10 days in Ogden

GOOD — every label check passes MARGINAL — one soft fail NO — hard fail or several soft

The rules this check uses

These rows are what the Ogden strip checks hour by hour: consensus paint-can requirements, plus the low-temp-formula band the engine marks MARGINAL.

Typical label thresholds for exterior painting — the ruleset behind every Ogden verdict above.
CheckThresholdWhy it matters
Air temperature 50–90°F (low-temp formulas from 35°F) The film (or mix) chemistry runs on temperature — both while you work and for the first hours after.
Overnight low ≥35°F during the first 24 h (≥40°F preferred) Curing continues after dark; the first night can undo a perfect afternoon.
Dry before ≤0.05" rain in the prior 12 h; watch back to 24 h Checked backward from your start hour using the two look-back days in the forecast data.
Dry after <0.05" rain for 24 h after The engine sums forecast rain hour by hour through the cure window for Ogden.
Evening dew-point spread ≥5°F from 6–11 pm When air temperature meets the dew point, water condenses on your fresh work first.
Daytime humidity ≤80% Read as the daytime maximum, 10 a.m.–5 p.m.; within 3 points of the limit counts as marginal.
Wind ≤15 mph (brush only up to 20 mph) Wind dries the leading edge too fast and carries overspray.

Always follow your product label — formulas vary. The table above is the typical range across major manufacturers, not a promise about your can.

Best months for exterior painting in Ogden

January: 0 workable days · high 38°F / low 22°F · rain 29% of daysFebruary: 0 workable days · high 44°F / low 24°F · rain 29% of daysMarch: 0 workable days · high 55°F / low 33°F · rain 24% of daysApril: 5 workable days · high 62°F / low 38°F · rain 27% of daysMay: 23 workable days · high 72°F / low 48°F · rain 26% of daysJune: 25 workable days · high 83°F / low 56°F · rain 17% of daysJuly: 4 workable days · high 92°F / low 64°F · rain 10% of daysAugust: 11 workable days · high 90°F / low 63°F · rain 12% of daysSeptember: 25 workable days · high 80°F / low 53°F · rain 17% of daysOctober: 15 workable days · high 66°F / low 41°F · rain 20% of daysNovember: 0 workable days · high 50°F / low 31°F · rain 23% of daysDecember: 0 workable days · high 39°F / low 23°F · rain 24% of daysJanuary avg high 38°FJanuary avg low 22°FFebruary avg high 44°FFebruary avg low 24°FMarch avg high 55°FMarch avg low 33°FApril avg high 62°FApril avg low 38°FMay avg high 72°FMay avg low 48°FJune avg high 83°FJune avg low 56°FJuly avg high 92°FJuly avg low 64°FAugust avg high 90°FAugust avg low 63°FSeptember avg high 80°FSeptember avg low 53°FOctober avg high 66°FOctober avg low 41°FNovember avg high 50°FNovember avg low 31°FDecember avg high 39°FDecember avg low 23°FJanuary: rain on 29% of daysJFebruary: rain on 29% of daysFMarch: rain on 24% of daysMApril: rain on 27% of daysAMay: rain on 26% of daysMJune: rain on 17% of daysJJuly: rain on 10% of daysJAugust: rain on 12% of daysASeptember: rain on 17% of daysSOctober: rain on 20% of daysONovember: rain on 23% of daysNDecember: rain on 24% of daysD22°57°92°00052325411251500
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
Ogden's calendar, scored: each month's days passing the temperature rules, discounted by that day's historical rain odds (NOAA 1991–2020). Not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 38°F 22°F 29% 0
February 44°F 24°F 29% 0
March 55°F 33°F 24% 0
April 62°F 38°F 27% 5
May 72°F 48°F 26% 23
June 83°F 56°F 17% 25
July 92°F 64°F 10% 4
August 90°F 63°F 12% 11
September 80°F 53°F 17% 25
October 66°F 41°F 20% 15
November 50°F 31°F 23% 0
December 39°F 23°F 24% 0

Figure 108 workable days a year in Ogden, spread across August through October. Shoulder months turn on the overnight rule: an afternoon at 90°F passes, but the 40°F night floor is what actually opens the season in August. The Utah table ranks every listed city by the same math.

July here fails on heat, not rain: the average high of 92°F sits over the 90°F label ceiling, and 27 of 31 days typically top 90°F. Midsummer work moves to dawn or waits for September.

The rain odds swing hard across the year — 10% of days in July up to 29% in February. Season the plan accordingly: prep in the wet months, apply in the dry ones.

If the walls pass, the roof might too: roof coating in Ogden uses the same film chemistry with tighter dew and wind limits.

Source honesty: every monthly figure on this page is the 1991–2020 normal at Ogden Pioneer Ph, Ut Us, 2.5 km from Ogden's center — your block's shade lines and wind exposure sit on top of that baseline. Scoring details are on the methodology page.

For contrast, Logan, UT’s exterior painting calendar sits one stop back on this route, and exterior painting in Orem, UT is next in line.

Ogden by the numbers

Prep checklist

  1. Find application day plus 24 dry hours with nights at 40°F+; Ogden offers that pairing most often in September (25 workable days).
  2. Scrape, then wash: loose paint and chalk go first, because latex only grips solid substrate.
  3. Give washed siding 24 hours — north walls in Ogden can need double after a February-grade soak.
  4. An ir surface thermometer settles arguments: label limits bind the wall surface, which outruns Ogden's air by 20°F+ in sun.
  5. Bare wood gets primer, stains get stain-blocker, gaps get caulk — in that order, on dry substrate.
  6. Sequence walls so you always paint in shade; midday sun skins latex before it levels.
  7. Cut in with an angled brush set, roll a wet edge, and drop the sprayer plan over 15 mph.
  8. Stop 2 hours before sunset: with September lows near 53°F, Ogden's siding meets the dew point before the late news.

Pro moves for Ogden conditions

Gear that saves a window

Transparency note: gear links here become affiliate links only when the program is enabled — today they are plain references. See the affiliate disclosure.

Frequently asked questions

What temperature can you paint outside?

50–90°F for standard formulas, 35°F+ for low-temp lines, and the wall itself must stay 5°F above the dew point. In Ogden the practical range is set by nights: the 40°F overnight floor arrives around May and leaves after October.

How many dry hours does exterior paint need before rain?

Plan 24 rain-free hours after the last coat; the engine fails any day that can't deliver them. With Ogden's rain odds swinging from 10% of days in July to 29% in February, the strip above is mostly a search for that dry pair.

Why does dew ruin fresh paint?

Fresh latex needs hours before it can take standing water; evening condensation gets there first on cooling siding. The check: air minus dew point from 6–11 p.m., 5°F or better. Humid February evenings in Ogden are when GOOD afternoons hide failing nights.

Can you paint in high humidity?

Up to about 80% daytime RH — above that, dry times stretch until the film meets the evening dew. 80–83% reads MARGINAL on the engine; more is a fail. Pair humidity with Ogden's dew-point spread rule and paint mornings-into-early-afternoons in the humid months.

What is surface temperature vs air temperature?

Two different numbers: air (what the app shows) and the wall (what the paint feels). Sun adds 20°F or more; evening radiational cooling subtracts. That's why the engine checks the 90°F top on Ogden's hot afternoons and the dew-point spread after sunset — both are surface problems the air forecast hides.

When does painting season end in Ogden?

When nights stop clearing 40°F — in Ogden that's typically after October, when average lows hit 41°F and falling. Low-temp formulas (35°F rated) buy a few extra weeks; the engine shows them as MARGINAL days before the hard close.

What humidity is too high for exterior painting?

Most acrylic paints apply well between 40 and 70 percent relative humidity. Above about 85 percent, water can't evaporate from the film, so drying stalls, sags develop, and surfactants rise as sticky brown streaks. Very low humidity under 20 percent causes the opposite problem — paint dries too fast to level. Check the hourly forecast for Ogden and aim for a falling-humidity afternoon.

What is the dew point rule for exterior painting?

Coating manufacturers require the surface to be at least 5°F above the dew point during application and initial drying. Closer than that, an invisible film of condensation forms on the siding, which ruins adhesion and can flash-rust bare metal. Practically, start after morning dew has fully evaporated and stop early enough that paint is set before the evening temperature drop.

How windy is too windy to paint outside?

Sustained winds above about 15 mph make brushing and rolling risky: paint skins before it levels, lap marks multiply, and dust or pollen embeds in the wet film. Spraying is far more sensitive — overspray drifts onto cars and neighbors above roughly 5 to 10 mph. Wind also accelerates drying, shortening your wet edge, so pick calm mornings for large walls.

Why is my fresh exterior paint blistering?

Heat blisters form when paint is applied to siding baking in direct sun — the surface skins over, then trapped solvent or water vaporizes underneath. Moisture blisters appear when paint goes over damp wood or when interior moisture pushes outward. Paint shaded sides, keep surfaces under about 90°F, and let rain-soaked siding dry a day or two before coating.

Exterior Painting glossary

Dew point spread
The gap between air temperature and dew point; painting standards call for surfaces at least 5°F above the dew point to prevent invisible condensation under fresh paint.
Surfactant leaching
Sticky brown or glossy streaks that surface when latex paint dries in cool, damp conditions; usually cosmetic and rinses off after the paint fully cures.
Wet edge
Keeping the boundary of just-applied paint wet so the next stroke blends invisibly; heat, wind, and low humidity shorten it and cause lap marks.
Surface temperature
The actual temperature of siding, which can run 20 to 40°F above air temperature in direct sun; paint labels' limits apply to the surface, not the forecast.
Full cure
The point when paint reaches final hardness and washability — typically 2 to 4 weeks for exterior acrylics — distinct from dry-to-touch, which takes only hours.
Blocking
Fresh paint sticking to itself where surfaces touch, like doors against jambs; worst in heat and humidity before the film fully cures.

People also search for

Other projects in Ogden

Exterior Painting nearby

Guides

Climatology: NOAA 1991–2020 normals via OGDEN PIONEER PH, UT US (2.5 km from Ogden center, elevation 4350 ft); live outlook by Open-Meteo.