Exterior Painting Weather in Logan, UT: 10-Day Windows & Best Months

Logan gives you roughly 98 workable exterior painting days a year, concentrated May through September. June leads the calendar with 24 workable days: average high 79°F, low 48°F, rain on 19% of days. Below: the live 10-day check and Logan's full month-by-month table.

GOOD — a clean label day MARGINAL — one borderline check NO — hard fail or stacked flags

The rules this check uses

The engine scores every Logan day against this table — typical latex-label numbers, with 35–50°F highs flagged for low-temperature formulas.

Typical label thresholds for exterior painting — the ruleset behind every Logan verdict above.
CheckThresholdWhy it matters
Air temperature 50–90°F (low-temp formulas from 35°F) Standard latex wants 50°F+. Some low-temperature formulas are rated down to 35°F.
Overnight low ≥35°F during the first 24 h (≥40°F preferred) Paint keeps curing overnight; a low under 40°F stalls standard latex.
Dry before ≤0.05" rain in the prior 12 h; watch back to 24 h What fell before you start matters as much as what falls after — surfaces hold water invisibly.
Dry after <0.05" rain for 24 h after The make-or-break window: rain here undoes the work, not just delays it.
Evening dew-point spread ≥5°F from 6–11 pm Surface should stay at least 5°F above the dew point; dew flat-spots fresh paint.
Daytime humidity ≤80% Humid air slows evaporation, stretching dry times into the risky evening hours.
Wind ≤15 mph (brush only up to 20 mph) Scored on the windiest working hour; the marginal band changes the method, not the day.

Always follow your product label — formulas vary. Treat the table as the consensus range across brands — the label in your hand is the final word.

Best months for exterior painting in Logan

How Logan months rank: temperature-rule days minus NOAA rain odds, from 1991–2020 normals. An estimate for planning, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 32°F 14°F 34% 0
February 37°F 18°F 33% 0
March 50°F 27°F 31% 0
April 59°F 34°F 33% 0
May 69°F 42°F 32% 14
June 79°F 48°F 19% 24
July 89°F 55°F 13% 15
August 88°F 53°F 15% 22
September 78°F 44°F 19% 22
October 63°F 33°F 24% 0
November 47°F 24°F 28% 0
December 34°F 16°F 32% 0

The working season runs May through September — about 98 workable days a year. The edges are night-limited: label rules want overnight lows of 40°F+, and Logan's nights only average that from May to September. Neighboring towns shift by a month or more — the Utah comparison shows where Logan sits.

Logan has a real wet/dry rhythm: January brings rain on 34% of days versus 13% in July. When the calendar gives you a July-side window, the dry-before and dry-after rules nearly take care of themselves.

Related check: roof coating in Logan — same 50–90°F chemistry, but roofs hit the dew point first and wind is a safety stop.

Climatology here is measured at Logan Radio Kvnu, Ut Us (1.3 km away). Treat the monthly numbers as the neighborhood average; a shaded north-side deck runs colder and damper than any of them. The exact formula lives in the methodology.

Logan by the numbers

Prep checklist

  1. Two clean days beat one perfect one: 24 h of dry cure and a 40°F+ night — June is Logan's highest-odds month (24 days).
  2. Wash the wall and scrape everything loose; paint bonds to substrate, not chalk.
  3. Give washed siding 24 hours — north walls in Logan can need double after a January-grade soak.
  4. Read the wall, not the app: an ir surface thermometer on sunlit siding shows 20°F+ over Logan's reported 79°F.
  5. Spot-prime bare wood and bleed-through, then caulk the gaps on a touch-dry surface.
  6. Follow the shade around the house — never a wall in direct midday sun.
  7. Cut in with an angled brush set, roll a wet edge, and drop the sprayer plan over 15 mph.
  8. Stop 2 hours before sunset: with June lows near 48°F, Logan's siding meets the dew point before the late news.

Gear that saves a window

Heads up: product links on this page may become affiliate links when the program is enabled. See the affiliate disclosure.

FAQ

What temperature can you paint outside?

Standard latex: 50–90°F with nights of 40°F+; low-temperature formulas are rated down to 35°F and the engine marks 35–50°F highs as MARGINAL for exactly that reason. Logan's edge months live in that band — May averages 69°F highs over 42°F nights.

How many dry hours does exterior paint need before rain?

About 24 — a 0.05"+ shower inside that window streaks or washes fresh latex. Logan offers those 24-hour dry runs most reliably in July (rain on just 13% of days); January is the gamble at 34%.

Why does dew ruin fresh paint?

Because a film that hasn't coalesced can't shed water: on cooling Logan siding, dew flat-spots the sheen and drags surfactants out in streaks. It forms when the wall reaches the dew point — the engine wants a 5°F spread from 6–11 p.m. Finish 2 hours before sunset and latex gets its lead time.

Can you paint in high humidity?

The label limit is ~80% relative humidity, and it compounds: humid air slows the cure, which pushes wet film into dew hours. The engine flags 80–83% and fails beyond. In Logan, the drier July air makes this a non-issue; muggy spells make it the day-killer.

What is surface temperature vs air temperature?

The forecast reports air; the label limits the wall. In direct sun a wall runs 20°F+ hotter — a 89°F Logan July day can put a west wall past the 90°F ceiling by mid-afternoon. Follow the shade around the house and check the surface by hand or IR thermometer.

When does painting season end in Logan?

When nights stop clearing 40°F — in Logan that's typically after September, when average lows hit 44°F and falling. Low-temp formulas (35°F rated) buy a few extra weeks; the engine shows them as MARGINAL days before the hard close.