Roof Coating Weather in Logan, UT: 10-Day Windows & Best Months

Logan gives you roughly 98 workable roof coating days a year, concentrated May through September. June leads the calendar with 24 workable days: average high 79°F, low 48°F, rain on 19% of days. Below: the live 10-day check and Logan's full month-by-month table.

Best month: June · 24 workable days

The next 10 days in Logan

GOOD — a clean label day MARGINAL — one borderline check NO — hard fail or stacked flags

The rules this check uses

Typical elastomeric/acrylic label requirements, applied to Logan's forecast above. Wind is stricter here than for any ground-level task — on a roof it's a safety limit.

Typical label thresholds for roof coating — the ruleset behind every Logan verdict above.
CheckThresholdWhy it matters
Air temperature 50–90°F Acrylic and elastomeric coatings want 50°F+ during application and initial cure.
Overnight low ≥40°F during the first 24 h Water-based coatings can be ruined by a cold, damp night before they skin over.
Dry before ≤0.05" rain in the prior 24 h; watch back to 48 h What fell before you start matters as much as what falls after — surfaces hold water invisibly.
Dry after <0.05" rain for 24 h after (48 h thick coats want 48 h) The make-or-break window: rain here undoes the work, not just delays it.
Evening dew-point spread ≥5°F from 6–11 pm Roofs radiate heat at night and hit the dew point before anything else in the yard.
Daytime humidity ≤85% Humid air slows evaporation, stretching dry times into the risky evening hours.
Wind ≤15 mph (roller only, no spray up to 20 mph) Scored on the windiest working hour; the marginal band changes the method, not the day.

Always follow your product label — formulas vary. Treat the table as the consensus range across brands — the label in your hand is the final word.

Best months for roof coating in Logan

January: 0 workable days · high 32°F / low 14°F · rain 34% of daysFebruary: 0 workable days · high 37°F / low 18°F · rain 33% of daysMarch: 0 workable days · high 50°F / low 27°F · rain 31% of daysApril: 0 workable days · high 59°F / low 34°F · rain 33% of daysMay: 14 workable days · high 69°F / low 42°F · rain 32% of daysJune: 24 workable days · high 79°F / low 48°F · rain 19% of daysJuly: 15 workable days · high 89°F / low 55°F · rain 13% of daysAugust: 22 workable days · high 88°F / low 53°F · rain 15% of daysSeptember: 22 workable days · high 78°F / low 44°F · rain 19% of daysOctober: 0 workable days · high 63°F / low 33°F · rain 24% of daysNovember: 0 workable days · high 47°F / low 24°F · rain 28% of daysDecember: 0 workable days · high 34°F / low 16°F · rain 32% of daysJanuary avg high 32°FJanuary avg low 14°FFebruary avg high 37°FFebruary avg low 18°FMarch avg high 50°FMarch avg low 27°FApril avg high 59°FApril avg low 34°FMay avg high 69°FMay avg low 42°FJune avg high 79°FJune avg low 48°FJuly avg high 89°FJuly avg low 55°FAugust avg high 88°FAugust avg low 53°FSeptember avg high 78°FSeptember avg low 44°FOctober avg high 63°FOctober avg low 33°FNovember avg high 47°FNovember avg low 24°FDecember avg high 34°FDecember avg low 16°FJanuary: rain on 34% of daysJFebruary: rain on 33% of daysFMarch: rain on 31% of daysMApril: rain on 33% of daysAMay: rain on 32% of daysMJune: rain on 19% of daysJJuly: rain on 13% of daysJAugust: rain on 15% of daysASeptember: rain on 19% of daysSOctober: rain on 24% of daysONovember: rain on 28% of daysNDecember: rain on 32% of daysD14°51°89°00001424152222000
Workable days (bar height)Avg high °FAvg low °FRain odds (dot size)
How Logan months rank: temperature-rule days minus NOAA rain odds, from 1991–2020 normals. An estimate for planning, not a forecast.
MonthAvg highAvg lowRain odds/dayWorkable days 
January 32°F 14°F 34% 0
February 37°F 18°F 33% 0
March 50°F 27°F 31% 0
April 59°F 34°F 33% 0
May 69°F 42°F 32% 14
June 79°F 48°F 19% 24
July 89°F 55°F 13% 15
August 88°F 53°F 15% 22
September 78°F 44°F 19% 22
October 63°F 33°F 24% 0
November 47°F 24°F 28% 0
December 34°F 16°F 32% 0

The working season runs May through September — about 98 workable days a year. The edges are night-limited: label rules want overnight lows of 40°F+, and Logan's nights only average that from May to September. Neighboring towns shift by a month or more — the Utah comparison shows where Logan sits.

Logan has a real wet/dry rhythm: January brings rain on 34% of days versus 13% in July. When the calendar gives you a July-side window, the dry-before and dry-after rules nearly take care of themselves.

Same film, easier footing: painting Logan walls shares every cure rule except the 20 mph safety stop.

Climatology here is measured at Logan Radio Kvnu, Ut Us (1.3 km away). Treat the monthly numbers as the neighborhood average; a shaded north-side deck runs colder and damper than any of them. The exact formula lives in the methodology.

For contrast, Lehi, UT’s roof coating calendar sits one stop back on this route, and roof coating in Ogden, UT is next in line.

Logan by the numbers

Prep checklist

  1. Wind first, rain second: 20 mph ends roof work regardless of sun. Logan's best odds stack up in June (24 workable days).
  2. Walk the roof after the last rain (34% of January days here) and mark every ponding spot — they dry last and blister first.
  3. Wash the membrane, then give it a full Logan drying day; the 24-hour lookback applies to seams, not just the field.
  4. Tape the seams (seam tape) and give repairs their full cure — coating won't bridge a moving crack.
  5. Match roof primer to your membrane type before anything opens; compatibility beats optimism.
  6. First-light start on the far side from the ladder: a 79°F June afternoon can mean a 110°F membrane.
  7. Roll with a 3/4-inch nap roller kit at the label spread rate; thin coat today beats thick coat racing January rain.
  8. Harness on anything above a walkable slope, and quit by early afternoon — Logan's roofs reach the dew point first.

Pro moves for Logan conditions

Gear that saves a window

Heads up: product links on this page may become affiliate links when the program is enabled. See the affiliate disclosure.

Frequently asked questions

What temperature do you need to apply roof coating?

The pail wants 50–90°F and a night that holds 40°F through the first cure. Surface heat is the hidden ceiling — add 30°F to a sunny afternoon. Logan's workable stretch runs May through September, per the table above.

How long does roof coating need to dry before rain?

24 hours minimum, 48 for thick coats — rain inside that window sends uncured acrylic into the gutters. Logan's July (rain on 13% of days) is the easy month for that window; January (34%) is the gamble.

Why does dew hit a roof first?

Roofs radiate heat straight to the open sky after sunset, cooling below air temperature — so they cross the dew point before anything in the yard. The engine wants a 5°F spread from 6–11 p.m.; on Logan's humid evenings, quit by early afternoon so the film closes first.

Can you apply roof coating in high humidity?

Up to about 85% daytime RH; 82–85% is MARGINAL, more is a fail. Humid air doubles dry times and pushes wet film into the evening dew — the exact failure roofs suffer first. In Logan, that pairs the humidity rule with January's 34% rain-day odds.

How windy is too windy to coat a roof?

Over 15 mph, stop spraying — roller only; over 20 mph, get off the roof. It's a safety stop, not a quality flag: a gust that staggers you at a deck rail can take you off a low slope. Logan's calm-morning pattern is the workable norm — June's 24 workable days assume exactly that early start.

What months are best for roof coating in Logan?

The table puts June, August and September in front; June averages 24 days clearing every check. Roof work also wants the calm-morning pattern, so within any month, early beats late — daily wind climbs after noon in most of UT.

Can you walk on a roof coating after it's applied?

Stay off until it cures — typically 24 to 72 hours depending on product, temperature, and humidity. Even then, coatings are maintenance surfaces, not decks: concentrated foot traffic wears thin spots, and cured silicone is dangerously slippery when wet or frosty. If you'll access HVAC equipment regularly, embed walk pads or granules in the coating along those routes.

Do I need a primer before applying roof coating?

Often, yes. Rusted metal needs a rust-inhibitive primer, asphalt and modified-bitumen roofs need a bleed-blocking primer under light-colored acrylics, and chalky old coatings need cleaning plus an adhesion primer. Many silicones self-prime on sound surfaces. Settle it with a test patch: coat a small area, let it cure, then try to peel it — if it releases cleanly, you need primer.

How thick should roof coating be applied?

Thickness is measured in mils (thousandths of an inch). One gallon spread over 100 square feet lays down about 16 wet mils, and most acrylic or silicone systems specify 20 to 30 dry mils total across two coats — roughly 1 to 1.5 gallons per 100 square feet per coat. Check your label's coverage chart and verify with a wet-film gauge as you go.

Will a roof coating stop an active leak?

No — coatings restore weathered but sound roofs; they aren't leak repair. Find and fix leaks first, replace any wet insulation (trapped moisture blisters coatings and rots decking), and repair seams and flashings with patching mastic. Once the roof is dry and tight, a coating extends its life and reflects heat. If leaks are widespread, get a roofer's assessment before spending on coating.

Roof Coating glossary

Mil thickness
One mil equals one-thousandth of an inch; coating specs list wet and dry mils, and a wet-film gauge confirms you're applying at the labeled rate.
Skin-over time
How quickly a coating films on top — often 1 to 4 hours; rain or dew before skin-over can wash fresh coating into the gutters.
Ponding water
Water still standing 48 hours after rain; it re-emulsifies most acrylic coatings, so ponding areas need silicone-rated products or drainage correction first.
Moisture-cure
How silicone coatings harden — by reacting with water vapor in the air — so humid days speed silicone curing while slowing water-based acrylics.
Bleed-through
Brown asphalt oils migrating up through light-colored coatings, staining them and cutting reflectivity; prevented with a stain-blocking primer over asphalt surfaces.
Adhesion test
A small cured test patch you try to peel from the roof before committing; clean release means the surface needs different prep or primer.